Liebert 8 Tons, 50 & 60Hz user manual Troubleshooting

Page 68

Troubleshooting

NOTES

60

Image 68
Contents Liebert Mini-Mate2 Page Table of Contents Microprocessor Control System Performance Microprocessor ControlsAlarms System OPERATION, TESTING, and MaintenanceFigures Table iii Heat rejection matchup 60 Hz Table iv Heat rejection matchup 50 HzPage Standard Product Features Optional Equipment Ancillary Ship Loose Accessories Installation Considerations Input Voltage Entering Fluid Temperature MinRoom Preparation Application limits, evaporator and chilled-water unitsLocation Considerations Drycooler Evaporator Equipment Inspection upon receipt System WeightsUnit weights Locking nut Hex nut Installing the Evaporator or Chilled-Water UnitsNylock Close Coupled Installations Nut Clamps are for shipping purposes onlyEvaporator Air Distribution Filter Box Connections for Ducted SystemsEvaporator external static pressure 60 at 3750 CFM 6371 CMH Hp Motor std Hp Motor opt Turns External OpenDrain installation Piping Connections and Coolant Requirements Drain LineCondensate Pump Humidifier Water Supply LineGeneral arrangement diagram chilled-water systems Chilled-Water Piping-Chilled-water Systems OnlyEquivalent Suction Feet Circuit Liquid Line Refrigerant R-22 PipingRecommended refrigerant line sizes Total refrigerant = Units and Lines Quick Connect FittingsTon unit refrigerant charge Line charges field pipingOptional Filter BOX Power Connections Electrical Connections, Evaporator or Chilled-Water UnitEvaporator unit electrical connections Front of UnitConsiderations for Specific Applications DuctingGeneral Considerations Control Connections Piping ConnectionsElectrical Connections Condensing Unit DPN000248Rev1 Heat rejection connection. Field Outdoor Air-Cooled Condensing Unit Installation Electrical ConnectionsElectric service connection High voltageLow voltage Earth ground connectionFootprint Dimensions 292 11-1/2152 Regulating Valve Water/Glycol Piping ConsiderationsCondensing Unit Fluid Requirements Indoor water/glycol condensing unit dimensional data Site Preparation and Installation Two circuits provided. Single circuit shown Optional Equipment Piping Optional free cooling coil 3-way valve on water/glycol unitsOptional free cooling coil 3-way valve on air-cooled units Checklist for Completed Installation Feature Overview Wall boxMain Menu Menu Active Alarms Alarm HistoryDefault setpoints and allowable ranges SetpointsSetup Operation Restart Time DelayTime DateShow DIP Switch 10.2 C/F DegreesHumidity Control Method Lead CompressorChange Passwords Alarm EnableSetup functions, default values and allowable ranges Calibrate SensorsAlarm Time Delay Common Alarm EnableCustom Alarms Alarm default time delaysEquipment Options Switches Custom TextLCD Display Contrast Nonvolatile MemoryTest Inputs Run DiagnosticsTest Outputs Test Micro TB3-1 TB3-2 TB3-3 TB4-4 Wall Box DIP Switches TB3-4 Connection to Terminal #4 WallboxTB3-3 Connection to Terminal #3 Wallbox TB3-2 Connection to Terminal #2 WallboxReheat Control Type Response Proportional ControlCooling Load Control Features Dehumidification / Humidification Percent RequiredCommunications Humidification Operation System ActivationAlarms Definitions and Troubleshooting Custom AlarmsHigh Head Pressure Air-Cooled SystemsTemperature Humidifier Problem AlarmHigh-Water Alarm Loss of PowerOptional/Custom Alarms Change FilterSystem Testing Maintenance and Component Operation Refrigeration System Suction PressureDischarge Pressure Thermostatic Expansion ValveHot Gas Bypass Optional Glycol Solution MaintenanceRegulating Valves Water/Glycol Condensing Units Replacement Procedures Steam Generating Humidifier Operation Procedures Circuit Board Adjustments Humidifier control board DIP switch settingsReplacing the Humidifier Canister AmpsMaintenance Inspection Checklist Troubleshooting Symptom Possible Cause Check or Remedy Cooling cycle too ShortDisplay freezes Control padsTroubleshooting Troubleshooting Troubleshooting Page Net ItiTin That