Jotul GF 100 DV II, GF 200 DV II manual Mobile Home Installation, Tools required

Page 15

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Mobile Home Installation

Fuel Conversion

These appliances can be installed for use in a mobile home in the U.S. and Canada provided:

1.The stove is secured to the floor of the mobile home. Use the Jøtul Floor Bracket Kit appropriate for your stove’s leg; see the Accessories listing on p. 29.

2.Provision must be made to secure an electrical ground between the stove and the mobile home chassis.

3.The stove is installed in accordance with Title 24 CFR, Part 3280- Manufactured Home Construction and Safety Standard, in the U.S. In Canada, comply with CSA Z240.4, Gas Equipped Recreational Vehicles and Mobile Housing.

4.Always contact your local officials about installation restrictions and requirements in your area.

THIS APPLIANCE MAY BE INSTALLED AS AN OEM INSTALLATION IN A MANUFACTURED (MOBILE) HOME AND MUST BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND THE MANUFACTURED HOME CONSTRUCTION AND SAFETY STAN- DARD, TITLE 24 CFR, PART 3280. THIS APPLI-

ANCE IS ONLY FOR USE WITH THE TYPE OF GAS THAT IS INDICATED ON THE STOVE’S RATING PLATE. A GAS CONVERSION KIT IS PROVIDED WITH THE NORDIC QT DIRECT VENT GAS STOVE.

THIS APPLIANCE MAY BE INSTALLED IN AN AFTERMARKET PERMANENTLY LOCATED, MANUFACTURED (MOBILE) HOME, WHERE NOT PROHIBITED BY LOCAL CODES.

CET APPAREIL PEUT ETRE INSTALLE DANS UN MAISON PREFABRIQUEE (MOBILE) DEJA INSTALLEE A DEMEURE SI LES REGLEMENTS LOCAUX LE PERMETTENT. CET APPAREIL DOIT ETRE UTILISE UNIQUEMENT AVEC LES TYPES DE GAS INDIQUES SUR LA PLAQUE SIGNALETIQUE. NE PAS L’UTILISER AVEC D’AUTRES GAS SAUF SI UN KITDE CONVER- SION CERTIFIE EST INSTALLE.

Your gas stove is shipped from the factory equipped to burn NATURAL GAS only. If PROPANE gas is to be used as fuel, the appliance must first be converted for use with propane.

GF100 DV II Nordic QT: Use Propane Conversion Kit 155628, supplied with the appliance.

GF200 DV II Lillehammer: Use Propane Conversion Kit 155626, supplied with the appliance.

WARNING:

THE CONVERSION KIT IS TO BE INSTALLED BY AN AUTHORIZED JØTUL SERVICE TECHNICIAN IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTION AND ALL CODES AND REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE. THE QUALIFIED AGENCY PERFORMING THIS WORK ASSUMES RESPONSIBILITY FOR THIS CONVERSION.

IN CANADA:

THE CONVERSION SHALL BE CARRIED OUT IN ACCORDANCE WITH THE RE- QUIREMENTS OF THE PROVINCIAL AU- THORITIES HAVING JURISDICTION AND IN ACCORDANCE WITH THE REQUIRE- MENTS OF THE CAN1-B149.1 AND .2 INSTALLATION CODE.

Tools required:

1/2” open ended wrench or deep-well socket, Torx T20 or slotted screwdriver, 4 mm allen wrench.

Conversion Kit Contents:

1, regulator tower labeled for propane

3, regulator tower screws

1, burner orifice (GF 100: #48 for NG, #56 for LP)

(GF 200: #46 for NG, 1.20 mm for LP)

1, pilot orifice (#51 for NG, #30 for LP)

Label A - to be completed and applied to the back of the stove

Label B - apply to the stove’s Rating Plate

Small valve label - apply to valve body

Conversion instructions are also shipped in the stove with the conversion kit.

15

Image 15
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Input Rates Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents GF 100 DV II AccessoriesGF 200 DV II Miscellaneous Kit Contents Jøtul GF 200 DV II Lillehammer SpecificationsRemove the Glass Panel Stove SetupSuggested Tools for Installation and Service Remove the Top PlateGlass Front Safety InformationLocation Hearth RequirementsAlcove Installation Vertical Termination Venting RequirementsIntake Air Restriction Horizontal TerminationHorizontal RUN Vertical Vent TerminationCo-linear Vent Installation These installation requirements must be followedVenting Through a Fireplace Min. / Max. Horizontal Run Horizontal Vent TerminationHorizontal Termination with Vertical Rise Wall Shield InstallationMin inches, U.S. / *12 inches 30 cm can Horizontal Termination ClearanceMobile Home Installation Conversion Kit ContentsTools required Never USE AN Open Flame to Check for GAS Leaks Gas Conversion ProcedureLeak test Gas Supply ConnectionHigh Altitude Adjustment Gas PressureInches water column To adjust the air shutter Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only Derating ProcedureOptional Wall Thermostat or Remote Control Log Set InstallationRemote Control Proper pilot flame appearance System CheckOperation MaintenanceGlass and Gasket Replacement Only Use Replacement KitDate of Purchase Name of InstallerOptional Blower # InstallationSnapstat terminal. See figs.35 Connect power cord to the nearest outletBlower Operation Attach the Blower to the stove47a 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly 47a47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer GF 100 DV II Nordic QT Cast Iron Parts ListReplace the Glass Frame Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Install the Logset. Refer to pgControl Valve Lighting InstructionsJøtul North America Jøtul AS