Jotul GF 100 DV II, GF 200 DV II manual Optional Blower #, Installation

Page 24

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Optional Blower # 155631

CONNECT THE GAS SUPPLY TO THE

STOVE BEFORE INSTALLING THIS

BLOWER. USE A 90° ELBOW OFF THE

GAS VALVE TO CREATE ADEQUATE

GAS LINE CLEARANCE.

„ THIS BLOWER MUST BE

ELECTRICALLY GROUNDED IN

ACCORDANCE WITH LOCAL CODES

Contents

1.Blower

2.Snapstat Wire Harness

3.Control Box

4.Snapstat Bracket

5.Rheostat Knob

6.Snapstat

7.Mounting Bracket (GF100 DV II ONLY)

8.M6 Flange Nuts, (2)

9.M6 x 12 Hex Bolts, (2)

10.#8 x 1/2” Sheet metal screw, (4)

Tools Required

1/4” socket driver

10 mm socket driver or wrench

OR, IN THE ABSENCE OF LOCAL

CODES, WITH THE CURRENT ANSI/

NFPA 70, NATIONAL ELECTRICAL

CODE OR CSA C22.1-CANADIAN

ELECTRICAL CODE.

„ THIS UNIT IS SUPPLIED WITH A

THREE-PRONG (GROUNDING) PLUG

FOR PROTECTION AGAINST SHOCK

HAZARD AND SHOULD BE PLUGGED

DIRECTLY INTO A PROPERLY

GROUNDED THREE-PRONG

RECEPTACLE. DO NOT CUT OR

REMOVE THE GROUNDING PRONG

FROM THE PLUG.

„ ALWAYS DISCONNECT THE POWER

SUPPLY WHEN PERFORMING ANY SERVICE ON THE FIREPLACE INSERT.

 

 

 

 

10

 

 

 

 

7

Upper Holes

 

 

 

 

for GF100

 

 

 

 

DV II

 

 

 

 

Lower Holes

4

6

 

 

 

 

 

for GF200

 

 

 

 

DV II

 

 

 

10

 

 

 

 

10

 

 

 

 

 

 

2

1

9

 

 

 

 

53 8

Figure 35. Blower Kit Components

Installation

1.Unpack and check the con- tents of the blower kit. Con- tact your dealer if any damage is evident or parts are missing. See fig. 35.

2.Attach the Control Box to the Snapstat Bracket using two #8 x 1/2” sheet metal screws. As shown in fig. 35, use the pair of mounting holes appro- priate for your stove.

3.Attach the Control Box to the studs located underneath the stove in the middle of the firebox floor using the two M6 hex nuts and a 10 mm socket driver or wrench. See fig. 36.

MANUAL

Snapstat

OFF

AUTO

BLOWER

Secure with

two Hex Head

Flange Nuts

Figure 36. Attach Control Switch Box.

24

Image 24
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Jøtul GF 100 DV II Nordic QT Specifications GF 100 DV II Miscellaneous Kit ContentsGF 100 DV II Accessories Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsStove Setup Suggested Tools for Installation and ServiceRemove the Top Plate Remove the Glass PanelSafety Information LocationHearth Requirements Glass FrontAlcove Installation Venting Requirements Intake Air RestrictionHorizontal Termination Vertical TerminationVertical Vent Termination Horizontal RUNCo-linear Vent Installation These installation requirements must be followedVenting Through a Fireplace Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canMobile Home Installation Conversion Kit ContentsTools required Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testHigh Altitude Adjustment Gas PressureInches water column Flame Appearance Air Shutter Adjustment High Altitude Orifice Chart GF 200 DV II OnlyDerating Procedure To adjust the air shutterOptional Wall Thermostat or Remote Control Log Set InstallationRemote Control System Check Proper pilot flame appearanceMaintenance Glass and Gasket ReplacementOnly Use Replacement Kit OperationName of Installer Date of PurchaseInstallation Optional Blower #Connect power cord to the nearest outlet Blower OperationAttach the Blower to the stove Snapstat terminal. See figs.3547a 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly 47a47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTOptional Antique Brick Panel Kit Installation Install the Lower PanelInstall the Logset. Refer to pg Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America