Jotul GF 100 DV II, GF 200 DV II manual Optional Antique Brick Panel Kit Installation

Page 30

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Optional

Antique Brick Panel Kit 155815

Installation

CAUTION!

THE BRICK PANELS ARE EXTREMELY FRAGILE. HANDLE WITH CARE. WEAR SAFETY GLOVES TO PROTECT HANDS.

1.Remove the Top Plate. Simply lift it up off of the stove body. It is not fastened.

2.GF 100 DV II ONLY: Remove the Front Plate by lifting straight up to disengage it from the sides.

3.Remove the Glass Frame. Disengage the two trunk latches located at the top of the firebox and lift the glass frame up and out of the firebox.

4.If installed, remove the Logset.

These parts are not fastened. Simply lift them out of the firebox. You do not have to remove the embers.

5.Install the Lower Panel.

Position it up against the back wall, resting on the Burner Skirt. Fig. 43.

6.Install one of the Side Panels, pushing it up against the firebox wall. Fig. 44

7.Position the Upper Panel. You should seat the Upper Panel down and forward so that no gaps are evident at the panel joints, as in Fig. 44.

8.Install the other Side Panel while holding the Upper Panel in position.

Adjust the panels so that the mortar joints align with those adjacent.

9.Install the Logset. Refer to pg. 20.

BE CERTAIN THAT NO EMBERS ARE BLOCKING THE PILOT ASSEMBLY OPENING.

10.Replace the Glass Frame.

Slide the frame down the slot in the front of the firebox. Be sure to push the frame into the slot in the bottom to ensure it is fully seated. The gasket at the top of the frame should be flush with the top of the firebox.

Re-engage the trunk latches with the top lip of the glass frame.

11. Replace the Top Plate.

Tools Required: Safety glasses and gloves

 

Upper Panel

Left Panel

221117

Right Panel

221114

221115

 

Lower Panel

221116

Figure 42. Brick Panel Kit Contents.

Burner Skirt

Figure 43. Install the Lower Rear Panel

Figure 44 . Install the Upper and Side Panels.

30

Image 30
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents GF 100 DV II Accessories Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsRemove the Top Plate Stove SetupSuggested Tools for Installation and Service Remove the Glass PanelHearth Requirements Safety InformationLocation Glass FrontAlcove Installation Horizontal Termination Venting RequirementsIntake Air Restriction Vertical TerminationVertical Vent Termination Horizontal RUNCo-linear Vent Installation These installation requirements must be followedVenting Through a Fireplace Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canMobile Home Installation Conversion Kit ContentsTools required Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testHigh Altitude Adjustment Gas PressureInches water column Derating Procedure Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only To adjust the air shutterOptional Wall Thermostat or Remote Control Log Set InstallationRemote Control System Check Proper pilot flame appearanceOnly Use Replacement Kit MaintenanceGlass and Gasket Replacement OperationName of Installer Date of PurchaseInstallation Optional Blower #Attach the Blower to the stove Connect power cord to the nearest outletBlower Operation Snapstat terminal. See figs.3547a 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly 47a47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTInstall the Logset. Refer to pg Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America