Jotul GF 100 DV II, GF 200 DV II manual Welcome to Jøtul

Page 2

GF 100 DV II Nordic QT GF 200 DV II Lillehammer

2

Welcome to Jøtul...

Congratulations on the purchase of your new Jøtul gas heater.

We at Jøtul are glad you’ve made the decision to warm your hearth with a Jøtul product. Your new stove exemplifies over 150 years experience as the world’s largest manufacturer of solid fuel burning appliances. We’ve been making fine quality cast iron wood and coal stoves and fireplaces continuously since 1853.

Great things come in small packages: both the Nordic QT and Lillehammer stoves combine advanced gas technology with the warm, traditional elements of cast iron. With proper use and care, your Jøtul stove will provide you with many years of safe, dependable and satisfying service.

Both of these stoves are direct vented gas heaters designed and approved for installation into a variety of configurations where close clearance to combustible material is required. Please take a few minutes to familiarize yourself with this manual and the features of your new Jøtul stove.

Image 2
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents GF 100 DV II Accessories Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsRemove the Top Plate Stove SetupSuggested Tools for Installation and Service Remove the Glass PanelHearth Requirements Safety InformationLocation Glass FrontAlcove Installation Horizontal Termination Venting RequirementsIntake Air Restriction Vertical TerminationVertical Vent Termination Horizontal RUNVenting Through a Fireplace Co-linear Vent InstallationThese installation requirements must be followed Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canTools required Mobile Home InstallationConversion Kit Contents Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testInches water column High Altitude AdjustmentGas Pressure Derating Procedure Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only To adjust the air shutterRemote Control Optional Wall Thermostat or Remote ControlLog Set Installation System Check Proper pilot flame appearanceOnly Use Replacement Kit MaintenanceGlass and Gasket Replacement OperationName of Installer Date of PurchaseInstallation Optional Blower #Attach the Blower to the stove Connect power cord to the nearest outletBlower Operation Snapstat terminal. See figs.3547a 47b 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47a GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTInstall the Logset. Refer to pg Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America