Jotul GF 100 DV II, GF 200 DV II manual Table of Contents

Page 3

Table of Contents

 

Specifications, GF 100 DV II

4

Specifications, GF 200 DV II

5

General Information

6

Service Tools

6

Safety Information

7

Installation Requirements

 

Location

7

Hearth Protection

7

Clearances

8

Mantel & Trim

8

Alcove

8

Vent Requirements

 

Adding Restriction

9

Vertical Termination

10

Horizontal Termination

12

Vent Terminal Clearances

............... 14

Mobile Home Installation

15

Fuel Conversion

15

Gas Connection

17

Gas Pressure

18

High Altitude Adjustment

18

Air Shutter Adjustment

19

Wall Thermostat

20

Remote Control

20

Log Set Installation

20

System Check

21

Operation

22

Maintenance

22

Glass Replacement

22

Optional Blower

24

Illustrated Parts Breakdown

........ 26, 27

Replacement Parts List

28, 29

Addendum - Brick Panel Kit

30

Lighting Instructions

Back Cover

THIS PRODUCT MUST BE INSTALLED BY A LICENSED PLUMBER OR GAS-FITTER WHEN INSTALLED IN THE COMMON- WEALTH OF MASSACHUSETTS.

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Jøtul GF 100 DV II Nordic QT

and

Jøtul GF 200 DV II Lillehammer

Direct Vent Gas Heaters

Manufactured and Distributed by:

Jøtul A.S.A.

Fredrikstad, Norway

Jøtul North America

Gorham, Maine

MEA No. 369-04-E

Test Standards

This appliance complies with National Safety standards and is tested and listed by Intertek Testing Services of Middleton, Wisconsin to

ANSI Z21.88-2002•CSA 2.33-M02 and CSA P.4.-01.2 for Canada.

DO NOT ATTEMPT TO ALTER OR MODIFY THE CONSTRUCTION OF THE APPLIANCE OR ITS COMPONENTS. ANY MODIFICATION OR ALTERATION WILL VOID THE WARRANTY, CERTIFICATION AND LISTING OF THIS APPLIANCE.

We recommend that our gas products be installed and serviced by professionals who are certified in the U.S. by the National Fireplace Institute® (NFI) as NFI Gas Specialists.

3

Image 3
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Input Rates Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents GF 100 DV II AccessoriesGF 200 DV II Miscellaneous Kit Contents Jøtul GF 200 DV II Lillehammer SpecificationsRemove the Glass Panel Stove SetupSuggested Tools for Installation and Service Remove the Top PlateGlass Front Safety InformationLocation Hearth RequirementsAlcove Installation Vertical Termination Venting RequirementsIntake Air Restriction Horizontal TerminationHorizontal RUN Vertical Vent TerminationCo-linear Vent Installation These installation requirements must be followedVenting Through a Fireplace Min. / Max. Horizontal Run Horizontal Vent TerminationHorizontal Termination with Vertical Rise Wall Shield InstallationMin inches, U.S. / *12 inches 30 cm can Horizontal Termination ClearanceMobile Home Installation Conversion Kit ContentsTools required Never USE AN Open Flame to Check for GAS Leaks Gas Conversion ProcedureLeak test Gas Supply ConnectionHigh Altitude Adjustment Gas PressureInches water column To adjust the air shutter Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only Derating ProcedureOptional Wall Thermostat or Remote Control Log Set InstallationRemote Control Proper pilot flame appearance System CheckOperation MaintenanceGlass and Gasket Replacement Only Use Replacement KitDate of Purchase Name of InstallerOptional Blower # InstallationSnapstat terminal. See figs.35 Connect power cord to the nearest outletBlower Operation Attach the Blower to the stove47a 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly 47a47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer GF 100 DV II Nordic QT Cast Iron Parts ListReplace the Glass Frame Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Install the Logset. Refer to pgControl Valve Lighting InstructionsJøtul North America Jøtul AS