Jotul GF 100 DV II, GF 200 DV II manual 47a 47b

Page 26

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

GF 100 DV II / GF 200 DV II

Illustrated Parts Breakdown / Firebox Assembly

39

60

61

55

54

58

1

40

59

41

42 43

44 45

46

10

36

37

38

 

 

 

 

 

 

 

35

 

 

 

 

 

 

 

 

 

34

 

 

 

 

 

 

 

64

 

 

 

 

 

 

14

15

16

17

 

4

53

52

51

50

49

4

65 66

47a

47b

23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

63

 

 

 

 

22

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

56

 

 

 

 

 

 

48

 

22

22

 

 

 

 

31 30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29

57

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24

4

 

 

 

 

4 5

 

62

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

33

24

28

27

25

26

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

2

3

 

4

 

4

6 7 8

10

A

 

 

11

12

13

 

 

Figure 39.

26

Image 26
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents GF 100 DV II Accessories Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsRemove the Top Plate Stove SetupSuggested Tools for Installation and Service Remove the Glass PanelHearth Requirements Safety InformationLocation Glass FrontAlcove Installation Horizontal Termination Venting RequirementsIntake Air Restriction Vertical TerminationVertical Vent Termination Horizontal RUNVenting Through a Fireplace Co-linear Vent InstallationThese installation requirements must be followed Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canTools required Mobile Home InstallationConversion Kit Contents Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testInches water column High Altitude AdjustmentGas Pressure Derating Procedure Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only To adjust the air shutterRemote Control Optional Wall Thermostat or Remote ControlLog Set Installation System Check Proper pilot flame appearanceOnly Use Replacement Kit MaintenanceGlass and Gasket Replacement OperationName of Installer Date of PurchaseInstallation Optional Blower #Attach the Blower to the stove Connect power cord to the nearest outletBlower Operation Snapstat terminal. See figs.3547a 47b 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47a GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTInstall the Logset. Refer to pg Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America