Jotul GF 100 DV II, GF 200 DV II manual Jøtul AS, Jøtul North America

Page 32

GF 100 DV II Nordic QT GF 200 DV II Lillehammer

August 2005 138003 D

This appliance must be installed in conformance with local and national building regulations. Before beginning the installation, it is important that the these instructions be carefully read and understood. Jøtul maintains a policy of continual product development. Consequently, products may differ in specification, color or type of accessories from those illustrated or described in various publications.

Jøtul vise sans cesse a ameliorer ses produits. C’est pourquoi, il se reserve le droit de modifier les specifications, couleurs etequipement sans avis prelable.

Jøtul AS

P.O. Box 1411

N-1602 Fredrikstad

Norway

Jøtul North America

55 Hutcherson Drive

Gorham, Maine 04038-2634

32

Image 32
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Jøtul GF 100 DV II Nordic QT Specifications GF 100 DV II Miscellaneous Kit ContentsGF 100 DV II Accessories Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsStove Setup Suggested Tools for Installation and ServiceRemove the Top Plate Remove the Glass PanelSafety Information LocationHearth Requirements Glass FrontAlcove Installation Venting Requirements Intake Air RestrictionHorizontal Termination Vertical TerminationVertical Vent Termination Horizontal RUNVenting Through a Fireplace Co-linear Vent InstallationThese installation requirements must be followed Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canTools required Mobile Home InstallationConversion Kit Contents Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testInches water column High Altitude AdjustmentGas Pressure Flame Appearance Air Shutter Adjustment High Altitude Orifice Chart GF 200 DV II OnlyDerating Procedure To adjust the air shutterRemote Control Optional Wall Thermostat or Remote ControlLog Set Installation System Check Proper pilot flame appearanceMaintenance Glass and Gasket ReplacementOnly Use Replacement Kit OperationName of Installer Date of PurchaseInstallation Optional Blower #Connect power cord to the nearest outlet Blower OperationAttach the Blower to the stove Snapstat terminal. See figs.3547a 47b 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47a GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTOptional Antique Brick Panel Kit Installation Install the Lower PanelInstall the Logset. Refer to pg Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America