Jotul GF 100 DV II, GF 200 DV II Parts List GF 100 DV II / GF 200 DV II Firebox Assembly, 47a

Page 27

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Parts List - GF 100 DV II / GF 200 DV II Firebox Assembly

 

Part Description

Part Number

1.

Rear Shroud, Matte Black

22055592

 

Rear Shroud, Jøtul Iron

22055585

2.

Burner Control Switch

129123

3.

Switch Box, Matte Black

22092592

 

Switch Box, Jøtul Iron

22092585

4.

Sheet Metal Screw, #8 x 1/2”

117117

5.

Air Diverter

220981

6.

Rating Plate

220920

7.

Rivet, 1/8”

117946

8.

Lanyard Cable

129159

9.

Bolt, M6 x 20

117117

10.

Screw, #8 x 3/4” Hex

117986

11.

Pilot Assembly

129471

A.

Electrode

129765

B.

Thermocouple

129766

C.

Pilot Line w/ Fittings

129446

D.

Thermopile

3094527

12.

Pilot Spacer

220546

13.

Pilot Gasket

129670

14.

Air Shutter

220928

15.

Air Shutter Gasket

221107

16.

Wing Nut

117975

17.

Washer, 25 x 1 1/2”

118029

18.

Jam Nut

129152

19.

Orifice Holder

220643

20.

Main Gas Flex Tube

129390

21.

Compression Nut

129464

22.

Compression Sleeve

129463

23.

Burner Orifice, #48 NG / GF100

...... 129407

 

Burner Orifice, #56 LP / GF100

........

129466

 

Burner Orifice, #46 NG / GF200

220975

 

Burner Orifice, 1.20 LP / GF200

221185

24.

Screw, 10-32 x 3/8” Phillips

117911

25.

Ignitor Bracket

3902576

26.

Ignitor

3902573

27.

Screw, M4 x 8 Phillips

117920

28.

Gas Valve, 50% Turn-down - NG

...... 220520

29.

Terminal Block Bracket

220930

30.

Screw, M4 x 12 Phillips

117921

31.

Terminal Block, 2 Pole

129154

32.

Nut, M4 Hex

117922

33.

Valve Retainer

220924

34.

Glass, Ceramic

220576

35.

Glass Gasket, Tadpole

129124

36.

Glass Frame, Matte Black

22136592

 

Glass Frame, Jøtul Iron

22136585

 

Glass Replacement Kit

155599

 

Part Description

Part Number

37.

Middle Log

221105

38.

Rear Log

221104

 

Log Set w/ Embers

155816

 

*Ember Stones, 4 oz

129123

39.

Dilution Air Cover

221108

40.

Burner Skirt

220797

41.

Burner Plate

220793

42.

Burner Gasket

220941

43. Burner Fastener, M6 AS Series

118007

44.

Burner Base

104253

45.

Venturi Tube

220796

46.

Tube Holder, Cast Iron

103992

47a.

Valance Bolt, M6 x 100 Hex Hd

....... 117955

 

(for GF 100 DV II)

 

 

47b.

Valance Bolt, M6 x 130 Hex Hd

....... 118033

 

(for GF 200 DV II)

 

 

48.

Valance Door, Matte Black

22093192

 

Valance Door, Jøtul Iron

22093185

49.

Firebox

221324

50.

Hex Nut, M6

9930

51.

Exhaust Baffle

220927

52.

Glass Frame Latch

129135

53.

Relief Door Guide

129499

54.

Relief Door Gasket

220735

55.

Relief Door

220589

56.

Adapter Pipe Gasket

129118

57.

Adapter Pipe

129322

58.

Wallshield, Matte Black

22092692

 

Wallshield, Jøtul Iron

22092692

59.

Air Deflector, Burner Skirt

221109

60.

Rear Restrictor Plate, Matte Blk

... 22111092

 

Rear Restrictor Plate, Jøtul Iron

... 22111085

61.

Side Restrictor Plate, Matte Blk

... 22099192

 

Side Restrictor Plate, Jøtul Iron ....

22099185

62.

Wire Harness, Burner Control

155813

63.

Star Washer

118032

64.

Burner, Complete

155600

65.Valance Hinge Spacer, 1” GF200 only . 118039

66.

Valance Hinge Spacer, 3”

118040

67.

*Orifice Retainer

221367

68.

*Tinnerman Clip (4)

220044

 

* Parts not illustrated

ALWAYS USE REPLACEMENTS PARTS PROVIDED BY AN AUTHORIZED JØTUL DEALER ONLY.

27

Image 27
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Input Rates Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Miscellaneous Kit Contents GF 100 DV II AccessoriesGF 200 DV II Miscellaneous Kit Contents Jøtul GF 200 DV II Lillehammer SpecificationsRemove the Glass Panel Stove SetupSuggested Tools for Installation and Service Remove the Top PlateGlass Front Safety InformationLocation Hearth RequirementsAlcove Installation Vertical Termination Venting RequirementsIntake Air Restriction Horizontal TerminationHorizontal RUN Vertical Vent TerminationCo-linear Vent Installation These installation requirements must be followedVenting Through a Fireplace Min. / Max. Horizontal Run Horizontal Vent TerminationHorizontal Termination with Vertical Rise Wall Shield InstallationMin inches, U.S. / *12 inches 30 cm can Horizontal Termination ClearanceMobile Home Installation Conversion Kit ContentsTools required Never USE AN Open Flame to Check for GAS Leaks Gas Conversion ProcedureLeak test Gas Supply ConnectionHigh Altitude Adjustment Gas PressureInches water column To adjust the air shutter Flame Appearance Air Shutter AdjustmentHigh Altitude Orifice Chart GF 200 DV II Only Derating ProcedureOptional Wall Thermostat or Remote Control Log Set InstallationRemote Control Proper pilot flame appearance System CheckOperation MaintenanceGlass and Gasket Replacement Only Use Replacement KitDate of Purchase Name of InstallerOptional Blower # InstallationSnapstat terminal. See figs.35 Connect power cord to the nearest outletBlower Operation Attach the Blower to the stove47a 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly 47a47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer GF 100 DV II Nordic QT Cast Iron Parts ListReplace the Glass Frame Optional Antique Brick Panel Kit InstallationInstall the Lower Panel Install the Logset. Refer to pgControl Valve Lighting InstructionsJøtul North America Jøtul AS