Jotul GF 100 DV II, GF 200 DV II Optional Wall Thermostat or Remote Control, Log Set Installation

Page 20

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Optional Wall Thermostat or Remote Control

Use only a 750 millivolt DC two-wire circuit thermostat with this appliance. The thermostat should be placed in the same room as the heater, typically 5 feet off the floor. Avoid drafty areas or any area that may affect the accuracy of the thermostat.

The thermostat should be connected to the Nordic QT using a minimum of 16 gauge wire with a maximum length of 35 feet of wire.

Connect the two thermostat wire leads to the two lower terminals on the terminal block located directly to the right of the valve. Do not overtighten the con- nections. IT IS NOT NECESSARY TO DISCONNECT ANY OTHER WIRES. See Fig. 27.

For thermostatic operation, the On/Off/T-Stat switch on the back of the stove must be in the T-stat position, and the pilot light must be running, as it is the power source for the thermostat.

At the thermostat, the two wires should be con- nected to the two connection screws on the thermostat base plate per the manufacturer’s instructions.

Remote Control

When using a remote, the remote receiver should be wired to the terminal block the same way the thermo- stat would be. See the instructions above.

Follow the operating instructions included with the Remote Control unit.

CAUTION:

LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING THE CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER OR DANGEROUS OPERATION. ALWAYS VERIFY PROPER OPERA- TION AFTER SERVICING THE APPLIANCE.

Log Set Installation

NOTE: Install the optional Brick Kit, if appropriate, before installing the Log Set. See page 30.

The Log Set and Ember Stones are packaged in foam inside the firebox. These must be installed in the firebox prior to burner operation. Wear gloves to prevent skin irritation from the ceramic fibers.

Position the Rear Log assembly as shown in fig 28, engaging the pins on the burner skirt with the adjacent holes in the underside of the log.

Locate the Middle Log as shown in fig. 29.

Also included is a bag of ember stones that simulate glowing coals when the burner is operating. These should be spread thinly over the burner plate.

NOTE: Keep the ember stones 1/4” away from the edge of the Burner Skirt. All the embers do not have to be used.

Figure 28. Install Rear Log.

THERMOPILE

TH

TP

TH

TP

VALVE

TERMINAL

BLOCK

Figure 27. Accessory wiring diagram.

ROCKER

SWITCH

ON

OFF

STAT

OPTIONAL

THERMOSTAT

or

REMOTE

CONTROL

Pilot

 

Assembly

 

1/4”

1/4”

6 mm

6 mm

Figure 29. Middle Log and ember stones in place.

20

Image 20
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Jøtul GF 100 DV II Nordic QT Specifications GF 100 DV II Miscellaneous Kit ContentsGF 100 DV II Accessories Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsStove Setup Suggested Tools for Installation and ServiceRemove the Top Plate Remove the Glass PanelSafety Information LocationHearth Requirements Glass FrontAlcove Installation Venting Requirements Intake Air RestrictionHorizontal Termination Vertical TerminationVertical Vent Termination Horizontal RUNVenting Through a Fireplace Co-linear Vent InstallationThese installation requirements must be followed Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canTools required Mobile Home InstallationConversion Kit Contents Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testInches water column High Altitude AdjustmentGas Pressure Flame Appearance Air Shutter Adjustment High Altitude Orifice Chart GF 200 DV II OnlyDerating Procedure To adjust the air shutterRemote Control Optional Wall Thermostat or Remote ControlLog Set Installation System Check Proper pilot flame appearanceMaintenance Glass and Gasket ReplacementOnly Use Replacement Kit OperationName of Installer Date of PurchaseInstallation Optional Blower #Connect power cord to the nearest outlet Blower OperationAttach the Blower to the stove Snapstat terminal. See figs.3547a 47b 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47a GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTOptional Antique Brick Panel Kit Installation Install the Lower PanelInstall the Logset. Refer to pg Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America