Jotul GF 100 DV II, GF 200 DV II manual Alcove Installation

Page 8

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Stove and Vent Clearance Requirements

Minimum Clearances from the Stove to Combustibles:

Measured from the stove top plate. See figs. 2-4.

 

For Both Stoves

 

Rear:

0” (0 mm)

 

Ceiling:

42” (1066 mm)

 

Corner:

2” (50 mm)

 

Sides:

3” (76 mm)

 

Minimum Clearances between Vent Pipe and

Combustible Materials:

 

Horizontal Run:

 

Off the top of the pipe

2” (50 mm)

Off the sides and bottom

1” (25 mm)

Vertical Run:

 

 

All sides

 

1” (25 mm)

Alcove Installation

 

Maximum Alcove Depth:

24” (610 mm)

Minimum Alcove Width:

34” (864 mm)

Minimum Ceiling Height

 

from stove top:

42” (1066 mm)

CLEARANCE TO REAR WALL = ZERO (0”)

GF 100 DV

Max.

 

Depth

or

24”

 

 

GF 200 DV

 

 

(610mm)

 

Min. 34”

(864 mm)

Figure 2. Alcove Installation Clearances.

Max. Mantel

Depth

11.5”

9.5”

7.5”

5.5”

Min. Mantel

3.5 Depth

Max. Top Trim

Depth = 1”

A C

E F

BD

G

 

 

GF 100 DV II

 

GF 200 DV II

 

 

Nordic QT

 

Lillehammer

 

 

 

 

A

50 in. (1270 mm)

52

1/2 in. (1333 mm)

 

 

 

 

B

48

1/2 in. (1232 mm)

51 in. (1295 mm)

C

47

in. (1194 mm)

49

1/2 in. (1257 mm)

D

45

1/2 in. (1156 mm)

48 in. (1219 mm)

E

44 in. (1118 mm)

46

1/2 in. (1181 mm)

F

4 1/4 in. (108 mm)

4 1/4 in. (108 mm)

G

22

1/4 in. (565 mm)

24

3/4 in. (629 mm)

 

 

 

Plinth Kit: 23 3/4 in. (603 mm)

 

 

 

Long Legs: 27 in. (686 mm)

Figure 3. Mantel Clearances - stove flush with fireplace face.

Max. Mantel

Depth

11.5”

9.5”

7.5”

5.5”

Min. Mantel

3.5 Depth

Max. Top Trim

Depth = 1”

A C

E F

BD

G

 

 

 

 

 

Max.

 

 

 

 

 

 

 

 

6 1/2”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GF 100 DV II

 

 

GF 200 DV II

 

 

Nordic QT

 

 

Lillehammer

 

 

 

 

 

 

 

 

A

49 in. (1245 mm)

51

1/2 in. (1308 mm)

B

47

1/2 in. (1206 mm)

50 in. (1270 mm)

C

46 in. (1168 mm)

48

1/2 in. (1232 mm)

D

44

1/2 in. (1130 mm)

47 in. (1194 mm)

E

43 in. (1092 mm)

45

1/2 in. (1156 mm)

F

17

3/4 in. (451 mm)

17

3/4 in. (451 mm)

G

22

1/4 in. (565 mm)

24

3/4 in. (629 mm)

 

 

 

Plinth Kit: 23 3/4 in. (603 mm)

 

 

 

Long Legs: 27 in. (686 mm)

 

 

 

 

 

 

 

 

 

Figure 4. Mantel Clearances - stove set back into fireplace, 6 1/2” maximum.

8

Image 8
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents Jøtul GF 100 DV II Nordic QT Specifications GF 100 DV II Miscellaneous Kit ContentsGF 100 DV II Accessories Input RatesJøtul GF 200 DV II Lillehammer Specifications GF 200 DV II Miscellaneous Kit ContentsStove Setup Suggested Tools for Installation and ServiceRemove the Top Plate Remove the Glass PanelSafety Information LocationHearth Requirements Glass FrontAlcove Installation Venting Requirements Intake Air RestrictionHorizontal Termination Vertical TerminationVertical Vent Termination Horizontal RUNVenting Through a Fireplace Co-linear Vent InstallationThese installation requirements must be followed Horizontal Vent Termination Min. / Max. Horizontal RunWall Shield Installation Horizontal Termination with Vertical RiseHorizontal Termination Clearance Min inches, U.S. / *12 inches 30 cm canTools required Mobile Home InstallationConversion Kit Contents Gas Conversion Procedure Never USE AN Open Flame to Check for GAS LeaksGas Supply Connection Leak testInches water column High Altitude AdjustmentGas Pressure Flame Appearance Air Shutter Adjustment High Altitude Orifice Chart GF 200 DV II OnlyDerating Procedure To adjust the air shutterRemote Control Optional Wall Thermostat or Remote ControlLog Set Installation System Check Proper pilot flame appearanceMaintenance Glass and Gasket ReplacementOnly Use Replacement Kit OperationName of Installer Date of PurchaseInstallation Optional Blower #Connect power cord to the nearest outlet Blower OperationAttach the Blower to the stove Snapstat terminal. See figs.3547a 47b 47b Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47a GF 100 DV II Nordic QT GF 200 DV II Lillehammer Cast Iron Parts List GF 100 DV II Nordic QTOptional Antique Brick Panel Kit Installation Install the Lower PanelInstall the Logset. Refer to pg Replace the Glass FrameLighting Instructions Control ValveJøtul AS Jøtul North America