Jotul Comprehensive Guide to 3 Parts Diagram for Electric Heaters

Page 25

GF 100 DV II Nordic QT

GF 200 DV II Lillehammer

Figure 37 . Attach Blower to the stove bottom and connect wires to Snapstat.

Mounting Bracket

for GF100 DV II

Snapstat

Connectors

M6 x 20 mm

#8 x 1/2” sheet

Hex Bolts

metal screws

 

 

4. Attach the Blower to the stove.

GF 100 DV II: First install the Mounting Bracket to

the holes in the bottom of the rear shroud using

BLOWER

two #8 x 1/2” sheet metal screws. Then attach the

Blower to the Mounting Bracket using the two M6

flange head hex bolts as shown in fig. 35 and 37.

GF 200 DV II: Attach the Blower directly to the

G

G

W

 

 

BK

 

 

W

BL

W

BK

tapped hole in the cast iron stove bottom using the

two M6 flange head hex bolts.

BK

POWER SUPPLY

SNAPSTAT

RHEOSTAT

5.

Attach either Snapstat wire connector to either

 

Snapstat terminal. See figs.35 and 37.

6.

Connect power cord to the nearest outlet.

Blower Operation

The variable-speed blower will enhance heat circulation around the firebox and out into the room. The blower is controlled by a heat activated switch (snapstat) that will ONLY function when the control switch is in AUTO setting. After the fire has been burning for a time, the snapstat will react to the heat and activate the blower. Fan speed may be manually adjusted with the rheostat knob. If the burner turns off, the blower will be shut off automatically when the stove cools down.

If automatic blower circulation is not desired, place the blower control switch in the MANUAL position.

GYBK

BL

SWITCH

MANUAL OFF AUTO

Figure 38. Blower Wiring Diagram

CAUTION:

LABEL ALL WIRES PRIOR TO DISCONNEC- TION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DAN- GEROUS OPERATION.

VERIFY OPERATION AFTER SERVICING.

ATTENTION:

Au moment de l’entrentien des commandes, etiquietez tous le fils avant le debranchement. es erreurs de ceblage peuvent entra tun fonctionnement inadequat et dangereux.

25

Image 25
Contents Installation and Operation Instructions Welcome to Jøtul Table of Contents GF 100 DV II Miscellaneous Kit Contents Jøtul GF 100 DV II Nordic QT SpecificationsGF 100 DV II Accessories Input RatesGF 200 DV II Miscellaneous Kit Contents Jøtul GF 200 DV II Lillehammer SpecificationsSuggested Tools for Installation and Service Stove SetupRemove the Top Plate Remove the Glass PanelLocation Safety InformationHearth Requirements Glass FrontAlcove Installation Intake Air Restriction Venting RequirementsHorizontal Termination Vertical TerminationHorizontal RUN Vertical Vent TerminationThese installation requirements must be followed Co-linear Vent InstallationVenting Through a Fireplace Min. / Max. Horizontal Run Horizontal Vent TerminationHorizontal Termination with Vertical Rise Wall Shield InstallationMin inches, U.S. / *12 inches 30 cm can Horizontal Termination ClearanceConversion Kit Contents Mobile Home InstallationTools required Never USE AN Open Flame to Check for GAS Leaks Gas Conversion ProcedureLeak test Gas Supply ConnectionGas Pressure High Altitude AdjustmentInches water column High Altitude Orifice Chart GF 200 DV II Only Flame Appearance Air Shutter AdjustmentDerating Procedure To adjust the air shutterLog Set Installation Optional Wall Thermostat or Remote ControlRemote Control Proper pilot flame appearance System CheckGlass and Gasket Replacement MaintenanceOnly Use Replacement Kit OperationDate of Purchase Name of InstallerOptional Blower # InstallationBlower Operation Connect power cord to the nearest outletAttach the Blower to the stove Snapstat terminal. See figs.3547a 47b 47a Parts List GF 100 DV II / GF 200 DV II Firebox Assembly47b GF 100 DV II Nordic QT GF 200 DV II Lillehammer GF 100 DV II Nordic QT Cast Iron Parts ListInstall the Lower Panel Optional Antique Brick Panel Kit InstallationInstall the Logset. Refer to pg Replace the Glass FrameControl Valve Lighting InstructionsJøtul North America Jøtul AS