Carrier 58CTA/CTX instruction manual Upflow Return Air Configurations and Restrictions

Page 18

58CT

A02075

Fig. 18 - Upflow Return Air Configurations and Restrictions

A02163

Fig. 19 - Downflow Return Air Configurations and Restrictions

A02162

Fig. 20 - Horizontal Return Air Configurations and Restrictions

18

Image 18
Contents Ama Safety Considerations Furnace Reliability HazardCUT Hazard Dimensions IntroductionClearances to Combustibles Electrostatic Discharge ESD Precautions Procedure Codes and StandardsLocation GeneralCarbon Monoxide Poisoning and Unit Damage Hazard Property Damage Hazard FIRE, Injury or Death HazardFire Hazard Location Relative to Cooling EquipmentCarbon Monoxide Poisoning Hazard AIR for Combustion VentilationFurnace Corrosion Hazard Outdoor Combustion Air MethodAir for Combustion, Ventilation, and Dilution for Outdoors Installation Upflow InstallationFIRE, EXPLOSION, and Carbon Monoxide Poisoning Hazard Downflow InstallationHorizontal Installation Suspended Furnace SupportPlatform Furnace Support Roll-Out ProtectionOpening dimensions In. mm Duct FlangesHorizontal Unit Suspension General Requirements Filter Arrangement Carbon Monoxide Poisoning HazardAIR Ducts Ductwork Acoustical Treatment Supply Air ConnectionsAir Delivery CFM With Filter FurnaceSpeed External Static Pressure IN. WC Size Inlet Return Air Connections Air Delivery CFM With Filter*Downflow Furnaces GAS Piping Fire or Explosion HazardUpflow Return Air Configurations and Restrictions Maximum Capacity of Pipe Furnace Damage HazardElectrical Shock and Fire Hazard WiringElectrical Connections Electrical Shock Hazard Furnace MAY not Operate HazardElectrical Data BOX RelocationElectrical Connection to J-BOX Electrical Box on Furnace Casing Side. See Fig Power Cord Installation in Furnace J-BOXBX. Cable Installation in Furnace J-BOX Fire or Electrical Shock HazardTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Accessories VentingGeneral Venting Requirements Masonry Chimney RequirementsChimney Inspection Chart Appliance Application Requirements Internal Area of ChimneyVent Height Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Furnace Vent Diameter Vent Height Orientation INPUTBTUH/HRUsing Tin Snips to Cut Tie Points START-UP, ADJUSTMENT, and Safety Check GeneralBurn Hazard Stage Furnace Setup Switch Description Start-Up ProceduresAdjustments Fire and Explosion HazardAltitude Derate Multiplier for U.S.A Redundant Automatic Gas Control ValveOrifice Hole Gas Rate cu ft. /hr Furnace Overheating HazardSeconds Size of Test Dial For Revolution Speed Selection Color Speed AS ShippedStage Furnace Blower OFF delay Setup Switch Check Safety ControlsChecklist Desired Heating Mode Setup Switch Blower OFF Delay SECA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Service and Maintenance Procedures IntroductionCare and Maintenance Carbon Monoxide Poisoning and Fire HazardWiring Diagram Cleaning AND/OR Replacing AIR Filter Filter Size Information IN. / MMBlower Motor and Wheel Cleaning Heat Exchanger Unit Damage HazardSequence of Operation Igniter Position-Top View58CT Single-Stage Thermostat and Two-Speed Cooling Adaptive Mode Thermidistat ModeSingle-Speed Cooling Wiring Diagrams TroubleshootingContinuous Blower Mode Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI