Carrier 58CTA/CTX Electrical Connections Electrical Shock Hazard, Furnace MAY not Operate Hazard

Page 20

FIELD 24-VOLT WIRING

FIELD 115-, 208/230-, 460-VOLT WIRING

FACTORY 24-VOLT WIRING

FACTORY 115-VOLT WIRING

 

NOTE 2

1-STAGE

 

 

 

 

FIVE

W C Y

R G THERMOSTAT

FIELD-SUPPLIED

 

TERMINALS

WIRE

 

FUSED DISCONNECT

 

 

58CT

THREE-WIRE

HEATING-

ONLY

BLK

BLK

 

W2

 

 

WHT

WHT

 

COM

 

 

 

 

 

W/W1

 

GND

 

Y/Y2

115-VOLT FIELD-

JUNCTION

 

 

SUPPLIED

BOX

R

 

FUSED

CONTROL

 

DISCONNECT

BOX

G

 

 

 

24-VOLT

NOTE 1

CONDENSING

UNIT

GND

208/230- OR 460-VOLT THREE PHASE

208/230-

VOLT

SINGLE PHASE

TERMINAL

BLOCK

FURNACE

NOTES: 1. Connect Y/Y2-terminal as shown for proper operation.

2.Some thermostats require a "C" terminal connection as shown.

3.If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.

A95236

Fig. 23 - Field Wiring Diagram

A 1/8-in. (3 mm) NPT plugged tapping, accessible for test gauge connection, MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve.

Piping should be pressure and leak tested in accordance with NFGC in the United States or CAN/CSA-B149.1-05 in Canada, local, and national plumbing and gas codes before the furnace has been connected. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.

If pressure exceeds 0.5 psig (14-in. wc), gas supply pipe must be disconnected from furnace and capped before and during supply pipe pressure test. If test pressure is equal to or less than 0.5 psig (14-in. wc), turn off electric shutoff switch located on furnace gas control valve and accessible manual equipment shutoff valve before and during supply pipe pressure test. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.

The gas supply pressure shall be within the maximum and minimum inlet supply pressures marked on the rating plate with the furnace burners ON and OFF.

ELECTRICAL CONNECTIONS

!WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Blower access panel door switch opens 115-v power to control. No component operation can occur. Do not bypass or close switch with panel removed.

See Fig. 23 for field wiring diagram showing typical field 115-v wiring. Check all factory and field electrical connections for tightness.

Field-supplied wiring shall conform with the limitations of 63_F (33_C) rise.

!WARNING

ELECTRICAL SHOCK AND FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70-2008 and Canadian Electrical Code CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur. This may consist of electrical wire, conduit approved for electrical ground or a listed, grounded power cord (where permitted by local code) when installed in accordance with existing electrical codes. Refer to the power cord manufacturer’s ratings for proper wire gauge. Do not use gas piping as an electrical ground.

!CAUTION

FURNACE MAY NOT OPERATE HAZARD

Failure to follow this caution may result in intermittent furnace operation.

Furnace control must be grounded for proper operation or else control will lock out. Control must remain grounded through green/yellow wire routed to gas valve and manifold bracket screw.

115-V WIRING

Verify that the voltage, frequency, and phase correspond to that specified on unit rating plate. Also, check to be sure that service provided by utility is sufficient to handle load imposed by this equipment. Refer to rating plate or Table 7 for equipment electrical specifications.

20

Image 20
Contents Ama CUT Hazard Safety ConsiderationsFurnace Reliability Hazard Dimensions IntroductionClearances to Combustibles Electrostatic Discharge ESD Precautions Procedure Codes and StandardsCarbon Monoxide Poisoning and Unit Damage Hazard LocationGeneral FIRE, Injury or Death Hazard Fire HazardProperty Damage Hazard Location Relative to Cooling EquipmentAIR for Combustion Ventilation Furnace Corrosion HazardCarbon Monoxide Poisoning Hazard Outdoor Combustion Air MethodAir for Combustion, Ventilation, and Dilution for Outdoors Installation Upflow InstallationDownflow Installation Horizontal InstallationFIRE, EXPLOSION, and Carbon Monoxide Poisoning Hazard Suspended Furnace SupportPlatform Furnace Support Roll-Out ProtectionOpening dimensions In. mm Duct FlangesHorizontal Unit Suspension Filter Arrangement Carbon Monoxide Poisoning Hazard AIR DuctsGeneral Requirements Ductwork Acoustical Treatment Supply Air ConnectionsSpeed External Static Pressure IN. WC Size Inlet Air Delivery CFM With FilterFurnace Air Delivery CFM With Filter* Downflow FurnacesReturn Air Connections GAS Piping Fire or Explosion HazardUpflow Return Air Configurations and Restrictions Maximum Capacity of Pipe Furnace Damage HazardWiring Electrical Connections Electrical Shock HazardElectrical Shock and Fire Hazard Furnace MAY not Operate HazardElectrical Connection to J-BOX Electrical DataBOX Relocation Power Cord Installation in Furnace J-BOX BX. Cable Installation in Furnace J-BOXElectrical Box on Furnace Casing Side. See Fig Fire or Electrical Shock HazardTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Accessories VentingGeneral Venting Requirements Masonry Chimney RequirementsChimney Inspection Chart Vent Height Appliance Application RequirementsInternal Area of Chimney Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Furnace Vent Diameter Vent Height Orientation INPUTBTUH/HRUsing Tin Snips to Cut Tie Points Burn Hazard START-UP, ADJUSTMENT, and Safety CheckGeneral Start-Up Procedures AdjustmentsStage Furnace Setup Switch Description Fire and Explosion HazardAltitude Derate Multiplier for U.S.A Redundant Automatic Gas Control ValveOrifice Hole Seconds Size of Test Dial For Revolution Gas Rate cu ft. /hrFurnace Overheating Hazard Speed Selection Color Speed AS ShippedCheck Safety Controls ChecklistStage Furnace Blower OFF delay Setup Switch Desired Heating Mode Setup Switch Blower OFF Delay SECA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Service and Maintenance Procedures IntroductionCare and Maintenance Carbon Monoxide Poisoning and Fire HazardWiring Diagram Blower Motor and Wheel Cleaning AND/OR Replacing AIR FilterFilter Size Information IN. / MM Cleaning Heat Exchanger Unit Damage HazardSequence of Operation Igniter Position-Top View58CT Single-Speed Cooling Single-Stage Thermostat and Two-Speed Cooling Adaptive ModeThermidistat Mode Continuous Blower Mode Wiring DiagramsTroubleshooting Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI