Table 7 – Electrical Data

VOLTS

 

OPERATING VOLTAGE

MAX

 

 

 

MAXIMUM

MAXIMUM

MINIMUM

 

 

RANGE

FURNACE

UNIT

WIRE

FUSE OR

HERTZ

 

 

UNIT

WIRE

 

 

 

SIZE

AMPACITY#

LENGTH ---

CKT BKR

PHASE

 

MAX*

MIN.*

AMPS

 

GAUGE

 

 

 

 

FT. (M)‡

AMPS†

115---

60---

1

127

104

5.3

045---

08/024045

7.42

49 (14.9)

15

14

115---

60---

1

127

104

7.1

045---

12/036045

9.67

38 (11.5)

15

14

115---

60---

1

127

104

5.2

070---

08/024070

7.22

51 (15.5)

15

14

115---

60---

1

127

104

7.3

070---

12/036070

9.90

37 (11.2)

15

14

115---

60---

1

127

104

10.1

070---

16/048070

13.42

27 (8.2)

15

14

115---

60---

1

127

104

8.2

090---

14/042090

10.84

34 (10.3)

15

14

115---

60---

1

127

104

9.9

090---

16/048090

13.0

28 (8.5)

15

14

115---

60---

1

127

104

12.9

090---

20/060090

16.70

34 (10.3)

20

12

115---

60---

1

127

104

8.2

110---

12/036110

10.76

34 (10.3)

15

14

115---

60---

1

127

104

10.1

110---

16/048110

13.19

28 (8.5)

15

14

115---

60---

1

127

104

13.7

110---

22/066110

17.60

32 (9.7)

20

12

115---

60---

1

127

104

10.2

135---

16/048135

13.28

27 (8.2)

15

14

115---

60---

1

127

104

14.5

135---

22/066135

18.61

30 (9.1)

20

12

115---

60---

1

127

104

15.0

155---

20/060155

19.34

29 (8.8)

20

12

* Permissible limits of the voltage range at which the unit operates satisfactorily.

#Unit ampacity = 125% of largest operating component’s full load amps plus 100% of all other potential operating components (EAC, humidifier, etc.) full load amps.

{ Time---delay type is recommended.

} Length shown is as measured 1 way along wire path between unit and service panel for maximum 2% voltage drop.

58CT

U.S. Installations: Make all electrical connections in accordance with National Electrical Code (NEC) ANSI/NFPA 70-2008 and any local codes or ordinances that might apply.

Canadian Installations: Make all electrical connections in accordance with Canadian Electrical Code CSA C22.1 or authorities having jurisdiction.

!WARNING

FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Do not connect aluminum wire between disconnect switch and furnace. Use only copper wire.

Use a separate branch electrical circuit with a properly sized fuse or circuit breaker for this furnace. See Table 7 for wire size and fuse specifications. A readily accessible means of electrical disconnect must be located within sight of the furnace.

NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control LED status indicator light will flash rapidly and furnace will NOT operate.

J-BOX RELOCATION

NOTE: If factory location of J-Box is acceptable, go to next section (ELECTRICAL CONNECTION TO J-BOX).

NOTE: On 14” wide casing models, the J-Box shall not be relocated to other side of furnace casing when the vent pipe is routed within the casing.

1.Remove and save two screws holding J-Box. (See Fig. 24.)

NOTE: The J-Box cover need not be removed from the J-Box in order to move the J-Box. Do NOT remove green ground screw inside J-Box. The ground screw is not threaded into the casing flange and can be lifted out of the clearance hole in casing while swinging the front edge of the J-box outboard of the casing.

2.Cut wire tie on loop in furnace wires attached to J-Box.

3.Move J-Box to desired location.

4.Fasten J-Box to casing with the two screws removed in Step 1.

5.Route J-Box wires within furnace away from sharp edges, rotating parts, and hot surfaces.

TWO

A02099

Fig. 24 - Relocating J-Box

ELECTRICAL CONNECTION TO J-BOX

Field-Supplied Electrical Box on Furnace J-Box Bracket. See Fig. 26.

1.Remove cover from furnace J-Box.

2.Attach electrical box to furnace J-Box bracket with at least two field-supplied screws through holes in electrical box into holes in bracket. Use blunt-nose screws that will not pierce wire insulation.

3.Route furnace power wires through holes in electrical box and J-Box bracket, and make field-wire connections in electrical box. Use best practices (NEC in U.S. and CSA C22.1 in Canada) for wire bushings, strain relief, etc.

4.Route and secure field ground wire to green ground screw on J-Box bracket.

5.Connect line voltage leads as shown in Fig. 23.

21

Image 21
Contents Ama Safety Considerations Furnace Reliability HazardCUT Hazard Introduction DimensionsClearances to Combustibles Codes and Standards Electrostatic Discharge ESD Precautions ProcedureLocation GeneralCarbon Monoxide Poisoning and Unit Damage Hazard Fire Hazard FIRE, Injury or Death HazardProperty Damage Hazard Location Relative to Cooling EquipmentFurnace Corrosion Hazard AIR for Combustion VentilationCarbon Monoxide Poisoning Hazard Outdoor Combustion Air MethodAir for Combustion, Ventilation, and Dilution for Outdoors Upflow Installation InstallationHorizontal Installation Downflow InstallationFIRE, EXPLOSION, and Carbon Monoxide Poisoning Hazard Suspended Furnace SupportRoll-Out Protection Platform Furnace SupportDuct Flanges Opening dimensions In. mmHorizontal Unit Suspension AIR Ducts Filter Arrangement Carbon Monoxide Poisoning HazardGeneral Requirements Ductwork Acoustical Treatment Supply Air ConnectionsAir Delivery CFM With Filter FurnaceSpeed External Static Pressure IN. WC Size Inlet Downflow Furnaces Air Delivery CFM With Filter*Return Air Connections GAS Piping Fire or Explosion HazardUpflow Return Air Configurations and Restrictions Furnace Damage Hazard Maximum Capacity of PipeElectrical Connections Electrical Shock Hazard WiringElectrical Shock and Fire Hazard Furnace MAY not Operate HazardElectrical Data BOX RelocationElectrical Connection to J-BOX BX. Cable Installation in Furnace J-BOX Power Cord Installation in Furnace J-BOXElectrical Box on Furnace Casing Side. See Fig Fire or Electrical Shock HazardTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Venting AccessoriesMasonry Chimney Requirements General Venting RequirementsChimney Inspection Chart Appliance Application Requirements Internal Area of ChimneyVent Height Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Diameter Vent Height Orientation INPUTBTUH/HR Furnace VentUsing Tin Snips to Cut Tie Points START-UP, ADJUSTMENT, and Safety Check GeneralBurn Hazard Adjustments Start-Up ProceduresStage Furnace Setup Switch Description Fire and Explosion HazardRedundant Automatic Gas Control Valve Altitude Derate Multiplier for U.S.AOrifice Hole Gas Rate cu ft. /hr Furnace Overheating HazardSeconds Size of Test Dial For Revolution Color Speed AS Shipped Speed SelectionChecklist Check Safety ControlsStage Furnace Blower OFF delay Setup Switch Desired Heating Mode Setup Switch Blower OFF Delay SECA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Introduction Service and Maintenance ProceduresCarbon Monoxide Poisoning and Fire Hazard Care and MaintenanceWiring Diagram Cleaning AND/OR Replacing AIR Filter Filter Size Information IN. / MMBlower Motor and Wheel Unit Damage Hazard Cleaning Heat ExchangerIgniter Position-Top View Sequence of Operation58CT Single-Stage Thermostat and Two-Speed Cooling Adaptive Mode Thermidistat ModeSingle-Speed Cooling Wiring Diagrams TroubleshootingContinuous Blower Mode Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI