Carrier 58CTA/CTX instruction manual Horizontal Left Application Vent Elbow Left

Page 31

SEE NOTES: 1,2,4,7,8,9 on the page following these figures

A03213

Fig. 41 - Horizontal Left Application - Vent Elbow Left

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03214

Fig. 42 - Horizontal Left Application - Vent Elbow Right

then Up

SEE NOTES: 1,2,4,7,8,9 on the page following these figures

A03218

Fig. 43 - Horizontal Right Application - Vent Elbow Right

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03215

Fig. 44 - Horizontal Left Application - Vent Elbow Up

58CT

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03216

Fig. 45 - Horizontal Left Application - Vent Elbow Right

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03219

Fig. 46 - Horizontal Right Application - Vent Elbow Left

then Up

31

Image 31
Contents Ama Furnace Reliability Hazard Safety ConsiderationsCUT Hazard Introduction DimensionsClearances to Combustibles Codes and Standards Electrostatic Discharge ESD Precautions ProcedureGeneral LocationCarbon Monoxide Poisoning and Unit Damage Hazard Location Relative to Cooling Equipment FIRE, Injury or Death HazardFire Hazard Property Damage HazardOutdoor Combustion Air Method AIR for Combustion VentilationFurnace Corrosion Hazard Carbon Monoxide Poisoning HazardAir for Combustion, Ventilation, and Dilution for Outdoors Upflow Installation InstallationSuspended Furnace Support Downflow InstallationHorizontal Installation FIRE, EXPLOSION, and Carbon Monoxide Poisoning HazardRoll-Out Protection Platform Furnace SupportDuct Flanges Opening dimensions In. mmHorizontal Unit Suspension Ductwork Acoustical Treatment Supply Air Connections Filter Arrangement Carbon Monoxide Poisoning HazardAIR Ducts General RequirementsFurnace Air Delivery CFM With FilterSpeed External Static Pressure IN. WC Size Inlet GAS Piping Fire or Explosion Hazard Air Delivery CFM With Filter*Downflow Furnaces Return Air ConnectionsUpflow Return Air Configurations and Restrictions Furnace Damage Hazard Maximum Capacity of PipeFurnace MAY not Operate Hazard WiringElectrical Connections Electrical Shock Hazard Electrical Shock and Fire HazardBOX Relocation Electrical DataElectrical Connection to J-BOX Fire or Electrical Shock Hazard Power Cord Installation in Furnace J-BOXBX. Cable Installation in Furnace J-BOX Electrical Box on Furnace Casing Side. See FigTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Venting AccessoriesMasonry Chimney Requirements General Venting RequirementsChimney Inspection Chart Internal Area of Chimney Appliance Application RequirementsVent Height Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Diameter Vent Height Orientation INPUTBTUH/HR Furnace VentUsing Tin Snips to Cut Tie Points General START-UP, ADJUSTMENT, and Safety CheckBurn Hazard Fire and Explosion Hazard Start-Up ProceduresAdjustments Stage Furnace Setup Switch DescriptionRedundant Automatic Gas Control Valve Altitude Derate Multiplier for U.S.AOrifice Hole Furnace Overheating Hazard Gas Rate cu ft. /hrSeconds Size of Test Dial For Revolution Color Speed AS Shipped Speed SelectionDesired Heating Mode Setup Switch Blower OFF Delay SEC Check Safety ControlsChecklist Stage Furnace Blower OFF delay Setup SwitchA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Introduction Service and Maintenance ProceduresCarbon Monoxide Poisoning and Fire Hazard Care and MaintenanceWiring Diagram Filter Size Information IN. / MM Cleaning AND/OR Replacing AIR FilterBlower Motor and Wheel Unit Damage Hazard Cleaning Heat ExchangerIgniter Position-Top View Sequence of Operation58CT Thermidistat Mode Single-Stage Thermostat and Two-Speed Cooling Adaptive ModeSingle-Speed Cooling Troubleshooting Wiring DiagramsContinuous Blower Mode Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI