Carrier 58CTA/CTX instruction manual A08485

Page 41

Table 15 – Orifice Size* and Manifold Pressures (In wc) for Gas Input Rate

58CT

A08485

41

Image 41
Contents Ama CUT Hazard Safety ConsiderationsFurnace Reliability Hazard Introduction DimensionsClearances to Combustibles Codes and Standards Electrostatic Discharge ESD Precautions ProcedureCarbon Monoxide Poisoning and Unit Damage Hazard LocationGeneral Fire Hazard FIRE, Injury or Death HazardProperty Damage Hazard Location Relative to Cooling EquipmentFurnace Corrosion Hazard AIR for Combustion VentilationCarbon Monoxide Poisoning Hazard Outdoor Combustion Air MethodAir for Combustion, Ventilation, and Dilution for Outdoors Upflow Installation InstallationHorizontal Installation Downflow InstallationFIRE, EXPLOSION, and Carbon Monoxide Poisoning Hazard Suspended Furnace SupportRoll-Out Protection Platform Furnace SupportDuct Flanges Opening dimensions In. mmHorizontal Unit Suspension AIR Ducts Filter Arrangement Carbon Monoxide Poisoning HazardGeneral Requirements Ductwork Acoustical Treatment Supply Air ConnectionsSpeed External Static Pressure IN. WC Size Inlet Air Delivery CFM With FilterFurnace Downflow Furnaces Air Delivery CFM With Filter*Return Air Connections GAS Piping Fire or Explosion HazardUpflow Return Air Configurations and Restrictions Furnace Damage Hazard Maximum Capacity of PipeElectrical Connections Electrical Shock Hazard WiringElectrical Shock and Fire Hazard Furnace MAY not Operate HazardElectrical Connection to J-BOX Electrical DataBOX Relocation BX. Cable Installation in Furnace J-BOX Power Cord Installation in Furnace J-BOXElectrical Box on Furnace Casing Side. See Fig Fire or Electrical Shock HazardTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Venting AccessoriesMasonry Chimney Requirements General Venting RequirementsChimney Inspection Chart Vent Height Appliance Application RequirementsInternal Area of Chimney Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Diameter Vent Height Orientation INPUTBTUH/HR Furnace VentUsing Tin Snips to Cut Tie Points Burn Hazard START-UP, ADJUSTMENT, and Safety CheckGeneral Adjustments Start-Up ProceduresStage Furnace Setup Switch Description Fire and Explosion HazardRedundant Automatic Gas Control Valve Altitude Derate Multiplier for U.S.AOrifice Hole Seconds Size of Test Dial For Revolution Gas Rate cu ft. /hrFurnace Overheating Hazard Color Speed AS Shipped Speed SelectionChecklist Check Safety ControlsStage Furnace Blower OFF delay Setup Switch Desired Heating Mode Setup Switch Blower OFF Delay SECA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Introduction Service and Maintenance ProceduresCarbon Monoxide Poisoning and Fire Hazard Care and MaintenanceWiring Diagram Blower Motor and Wheel Cleaning AND/OR Replacing AIR FilterFilter Size Information IN. / MM Unit Damage Hazard Cleaning Heat ExchangerIgniter Position-Top View Sequence of Operation58CT Single-Speed Cooling Single-Stage Thermostat and Two-Speed Cooling Adaptive ModeThermidistat Mode Continuous Blower Mode Wiring DiagramsTroubleshooting Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI