Carrier 58CTA/CTX instruction manual Platform Furnace Support, Roll-Out Protection

Page 12

Platform Furnace Support

Construct working platform at location where all required furnace clearances are met. (See Fig. 2 and 17.) For furnaces with 1-in. (25 mm) clearance requirement on side, set furnace on non-combustible blocks, bricks or angle iron. For crawlspace installations, if the furnace is not suspended from the floor joists, the ground underneath furnace must be level and the furnace set on blocks or bricks.

Roll-Out Protection

Provide a minimum 17-3/4-in. x 22-in. (451 x 559 mm) piece of sheet metal for flame roll-out protection in front of burner area for furnaces closer than 12 inches (305 mm) above the combustible deck or suspended furnaces closer than 12 inches (305 mm) to joists. The sheet metal MUST extend underneath the furnace casing by 1 in. (25 mm) with the door removed.

The bottom closure panel on furnaces of widths 17-1/2 in. (445

58CT

mm) and larger may be used for flame roll-out protection when

bottom of furnace is used for return air connection. See Fig. 17

for proper orientation of roll-out shield.

 

 

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return-air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:

1.Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)

2.Rotate bottom filler panel downward to release holding tabs.

3.Remove bottom closure panel.

4.Reinstall bottom filler panel and screws.

Side Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return-air opening. This panel MUST be in place when side return air inlet(s) are used without a bottom return air inlet.

 

A

 

PLENUM

 

OPENING

B

D

 

FLOOR

 

OPENING

 

C

A96283

Fig. 11 - Floor and Plenum Opening Dimensions

FURNACE

(OR COIL CASING

WHEN USED)

COMBUSTIBLE

FLOORING

DOWNFLOW

SUBBASE

SHEET METAL

PLENUM

FLOOR

OPENING

A96285

Fig. 12 - Furnace, Plenum, and Subbase installed on a

Combustible Floor

FURNACE

APPROVED

COIL ASSEMBLY

OR

COIL BOX

COMBUSTIBLE

FLOORING

SHEET METAL

PLENUM

FLOOR

OPENING

A08556

Fig. 13 - Furnace, Plenum, and Coil Assembly or Coil Box

Installed on a Combustible Floor

12

Image 12
Contents Ama Safety Considerations Furnace Reliability HazardCUT Hazard Dimensions IntroductionClearances to Combustibles Electrostatic Discharge ESD Precautions Procedure Codes and StandardsLocation GeneralCarbon Monoxide Poisoning and Unit Damage Hazard FIRE, Injury or Death Hazard Fire HazardProperty Damage Hazard Location Relative to Cooling EquipmentAIR for Combustion Ventilation Furnace Corrosion HazardCarbon Monoxide Poisoning Hazard Outdoor Combustion Air MethodAir for Combustion, Ventilation, and Dilution for Outdoors Installation Upflow InstallationDownflow Installation Horizontal InstallationFIRE, EXPLOSION, and Carbon Monoxide Poisoning Hazard Suspended Furnace SupportPlatform Furnace Support Roll-Out ProtectionOpening dimensions In. mm Duct FlangesHorizontal Unit Suspension Filter Arrangement Carbon Monoxide Poisoning Hazard AIR DuctsGeneral Requirements Ductwork Acoustical Treatment Supply Air ConnectionsAir Delivery CFM With Filter FurnaceSpeed External Static Pressure IN. WC Size Inlet Air Delivery CFM With Filter* Downflow FurnacesReturn Air Connections GAS Piping Fire or Explosion HazardUpflow Return Air Configurations and Restrictions Maximum Capacity of Pipe Furnace Damage HazardWiring Electrical Connections Electrical Shock HazardElectrical Shock and Fire Hazard Furnace MAY not Operate HazardElectrical Data BOX RelocationElectrical Connection to J-BOX Power Cord Installation in Furnace J-BOX BX. Cable Installation in Furnace J-BOXElectrical Box on Furnace Casing Side. See Fig Fire or Electrical Shock HazardTwo-Stage Furnace with Two-Speed Air Conditioner See notes 2, 11, and 12 on the page following these figures Accessories VentingGeneral Venting Requirements Masonry Chimney RequirementsChimney Inspection Chart Appliance Application Requirements Internal Area of ChimneyVent Height Upflow Application-Vent Elbow Up Downflow Application-Vent Elbow Up then Left Horizontal Left Application Vent Elbow Left Furnace Vent Diameter Vent Height Orientation INPUTBTUH/HRUsing Tin Snips to Cut Tie Points START-UP, ADJUSTMENT, and Safety Check GeneralBurn Hazard Start-Up Procedures AdjustmentsStage Furnace Setup Switch Description Fire and Explosion HazardAltitude Derate Multiplier for U.S.A Redundant Automatic Gas Control ValveOrifice Hole Gas Rate cu ft. /hr Furnace Overheating HazardSeconds Size of Test Dial For Revolution Speed Selection Color Speed AS ShippedCheck Safety Controls ChecklistStage Furnace Blower OFF delay Setup Switch Desired Heating Mode Setup Switch Blower OFF Delay SECA08485 Orifice Size and Manifold Pressures In wc for Gas Input Rate A08219 A08219A Service and Maintenance Procedures IntroductionCare and Maintenance Carbon Monoxide Poisoning and Fire HazardWiring Diagram Cleaning AND/OR Replacing AIR Filter Filter Size Information IN. / MMBlower Motor and Wheel Cleaning Heat Exchanger Unit Damage HazardSequence of Operation Igniter Position-Top View58CT Single-Stage Thermostat and Two-Speed Cooling Adaptive Mode Thermidistat ModeSingle-Speed Cooling Wiring Diagrams TroubleshootingContinuous Blower Mode Troubleshooting Guide 2-Speed KitAdapter Chimneyin Usedswitch Shutoffvent Blocked Catalog No58CT---10SI