Potthof & Co 33kw, 24kw, 28kw manual Technical Data, Gold Combi 24, 28 & 33 HE a

Page 10

4.0Technical Data

4.1Gold Combi 24, 28 & 33 HE A

Appliance Type

 

 

 

C13

C33

C53

 

 

Appliance Category

CAT I 2H

 

 

 

Heat Input CH (Net)

Max

Min

 

 

24 model

 

kW

20.5

7

 

 

28 model

 

kW

24.7

9

 

 

33 model

 

kW

28.9

9.7

 

 

 

 

 

 

 

 

 

 

Heat Input CH (Gross)

Max

Min

 

 

24 model

kW

22.7

7.8

 

 

28 model

kW

27.4

10

 

 

33 model

kW

32.1

10.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output CH (Non-Condensing)

 

 

 

 

 

 

 

 

 

 

 

 

 

Max

Min

 

 

24 model

 

kW

20

6.8

 

 

28 model

 

kW

24

8.7

 

 

33 model

 

kW

28

9.4

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output CH (Condensing)

 

 

 

 

 

 

 

 

 

 

 

 

 

Max

Min

 

 

24 model

 

kW

21

7.4

 

 

28 model

 

kW

25.9

9.5

 

 

33 model

 

kW

30.3

10.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Input DHW (Net)

Max

 

 

 

 

24 model

 

kW

24.7

 

 

 

 

28 model

 

kW

28.9

 

 

 

 

33 model

 

kW

34

 

 

 

 

 

 

 

 

 

 

Heat Input DHW (Gross)

Max

 

 

 

24 model

 

kW

27.4

 

 

 

28 model

 

kW

32.1

 

 

 

33 model

 

kW

37.7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output DHW

Max

 

 

 

 

24 model

 

kW

24

 

 

 

 

28 model

 

kW

28

 

 

 

 

33 model

 

kW

33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Max Gas Rate (Natural Gas - G20)

 

 

 

 

 

 

 

 

 

 

(After 10 mins)

 

 

 

 

 

24 model

 

m3/h

2.61

 

 

 

 

 

28 model

 

m3/h

3.1

 

 

 

 

 

33 model

 

m3/h

3.6

 

 

 

Inlet Pressure (Natural Gas - G20)

mbar

20

 

 

 

 

 

 

 

 

 

Injector (Natural Gas - G20)

 

 

 

7.5mm (24&28 model)

12mm(33 model)

 

 

 

 

 

Electrical Supply

 

230V~ 50Hz

(Appliance must be connected to an

earthed supply)

 

 

 

 

 

 

 

 

 

 

 

Power Consumption

 

 

 

 

155W (24 & 28 model)

160W (33 model)

 

 

 

 

 

 

 

Electrical Protection

 

 

 

 

 

 

 

IPX0D

 

 

 

 

 

 

 

External Fuse Rating

 

3A

 

 

 

 

 

 

 

Internal Fuse Rating

 

F2L

Condensate Drain

To accept 21.5mm (3/4 in) plastic waste pipe

Flue Terminal

Diameter

 

100mm

Dimensions

Projection

125mm

 

 

 

 

 

Connections

 

 

copper tails

Gas Supply

 

 

-

22mm

Central Heating Flow

 

 

-

22mm

Central Heating Return

-

22mm

Cold Water Mains Inlet

-

15mm

DHW Flow

 

 

-

15mm

Pressure Relief Discharge

-

15mm

 

 

 

 

 

 

Outercase Dimensions

 

 

Casing Height

 

 

 

- 780mm

Overall Height Inc Flue Elbow

 

- 965mm

Casing Width

 

 

 

- 450mm

Casing Depth

 

 

 

- 345mm

 

 

 

 

 

 

 

Clearances

 

 

 

 

Above Casing

200 mm Min

 

Below Casing

150 mm Min*

 

Front

450 mm Min (For Servicing)

Front

5 mm Min (In Operation)

L.H. Side

5 mm Min

 

R.H. Side

5 mm Min (In Operation)

*This is the MINIMUM recommended dimension. Greater clearance than this will aid installation and maintenance.

Weights (kg)

 

 

 

 

(24)

(28)

(33)

Packaged Boiler Carton

48.6

49.2

51

Installation Lift Weight

43.6

44.2

46

NOx Class

 

5

 

 

Central Heating Primary Circuit

 

Pressures

 

 

 

 

 

 

 

 

 

bar

Safety Discharge

 

 

 

3

Max Operating

 

 

 

2.5

Min Operating

 

 

 

0.5

Recommended Operating Range

1-2

 

 

 

 

 

 

DHW Circuit

 

bar

 

Pressures

 

 

 

 

Max Operating

 

8

 

 

Min Operating

 

0.15

 

 

 

 

 

 

 

Flow Rates

(24)

(28)

(33)

 

 

l/min

l/min

l/min

DHW Flow Rate

 

 

 

 

@ 30o C Rise

11.43

13.3

15.7

DHW Flow Rate

 

 

 

 

@ 35o C Rise

9.8

11.5

13.5

Min Working

 

 

 

 

DHW Flow Rate

2

2

 

2

IMPORTANT: Where Low Flow Taps or Fittings are intended to be used in the DHW system connected it is strongly recommended that the DHW flow rate DOES NOT fall below 2.5l/min. This will ensure reliable operation of the DHW function.

Pump

 

 

 

Available Head

See graph below

 

 

 

Expansion Vessel

- (For Central Heating

only. Integral with appliance)

 

 

 

 

bar

 

Min Pre-charge Pressure

0.5

 

 

 

(24,28)

(33)

Max Capacity of

 

litre

litre

CH System

 

125

155

Primary Water Content

 

 

of Boiler (unpressurised)

2.5

2.8

Temperatures

C.H. Flow Temp (adjustable)

25°C to 80°C max (± 5°C)

D.H.W. Flow Temp (adjustable)

35°C to 60°C max (± 5°C) dependent upon flow rate

NOTE: All data in this section are nominal values and subject to normal production tolerances.

SEDBUK Declaration

The efficiency is 91.1% (all models)

This value is used in the UK Government’s Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from which it has been calculated has been certified by 0087.

Pump - Available Head

 

5.5

 

5

 

4.5

 

4

 

3.5

 

3

(wg)

2.5

 

Metre

2

1.5

 

 

1

0.5

0

0

200

400

600

800

1000

1200

10© Baxi Heating UK Ltd 2012

Flow Rate (l/h)

Image 10
Contents Installation & Service Instructions Natural Gas Benchmark SchemeInstaller Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairCodes of Practice refer to the most recent version Preparation Safe Manual HandlingGeneral TechniqueContents Introduction Contents of PackDescription Expansion Vessel Automatic Air Vent General LayoutLayout Circulation Pump Drain Off PointFrost Protection Mode Central Heating Mode FigDomestic Hot Water Mode Fig Appliance OperationTechnical Data Gold Combi 24, 28 & 33 HE aDimensions and Fixings Central Heating Circuit System DetailsInformation BypassSystem Filling and Pressurising Fig Safety Pressure Relief Valve FigExpansion Vessel Central Heating only Showers Domestic Hot Water Circuit FigHard Water Areas Clearances Figs Site RequirementsLocation At leastGas Supply Site RequirementVentilation of Compartments Electrical SupplyPer Metre PerPipe run Minimum Fall Run50mm per Minimum Fall500mm min Run Minimum fallBelow windows or openings on pitched roofs 2000 Plume Displacement KitFlue Likely flue positions requiring a flue terminal guardFlue Options Total equivalent length = +B+C+2x90BendsTotal Equivalent Length = +B+C+1x90Bend Key Accessory Size Code No Flue AccessoriesTelescopic Flue inc. elbow Twin Flue Connection Twin Flue Duct AdaptorAir Duct Connection Flue Duct Connection Boiler Adaptor Flue Trim Flue DimensionsFor Roof Terminals Terminal Guard FigPlume Displacement Plume Displacement Kit FigExample 28/33Determining Permissible Lengths ElbowGeneral Fitting Notes 50mm30mm Using a suitable bit e.g mm, drill through Elbow to allow the flue to be installed as shown60Ø extension piece. It must be secured using two Extension and outlet. Secure using two of the screwsFlushing InstallationUnpacking & Initial Preparation After considering the site requirementsFitting the Filling Loop Kit Condensate Drain see section Fitting the Safety Pressure Relief Discharge Pipe FigFitting The Boiler Tighten all the connectionsEnsure Elbow is fully engaged into Boiler Adaptor Fitting The FlueWall Thickness Flue Elbow Wall Thickness Waste Flue25mm Extension Cut End Inner Flue Support BracketEnsure Extension is fully engaged into Boiler Adaptor Preliminary Electrical Checks Making The Electrical ConnectionsTerminal Block Cover Cable Clamp Commissioning the Boiler Selector Switch DisplayCommissioning Screw Pump Automatic Air VentCheck the Operational Working Gas Inlet Pressure Temperature Control Selector Switch DisplayTemperature Control Gas Pressure Test Point Gas Valve It is necessary to set the boiler to ‘Calibration Mode’Setting the Timer Completion CompletionCase Front Panel Facia Panel 13 .1 Annual Servicing ServicingAnnual Servicing Inspection Electrode Position 10 ±1Igniter Fig Changing ComponentsSpark and Sensing Electrodes Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorInsulation Fig Burner FigExtension Piece DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Complete Fig Pump Head Only FigAutomatic Air Vent Fig Hall Effect Sensor Fig Pressure Gauge FigsPressure Relief Valve Fig Diverter Valve Motor Unit & Assembly Fig Plate Heat Exchanger FigSelector Switch Fig 14.22 P.C.B. FigGas Valve Fig Expansion Vessel FigFlue Adaptor Test Point Plug Analyser Probe Setting the Gas ValveSetting the Gas Valve CO2 check CO2 should be 8.4% ± Reduce CO2Illustrated Wiring Diagram Electrical426 Short Parts ListShort Parts List 315316 311 404419 422 400 415Initial Fault Finding Checks Fault FindingError Codes Reset position for 5 seconds Error 133 flashingGo to section ‘A’ Turn the selector switch to Pump runsOpen DHW tap fully Error 133 flashing Go to section ‘I’Turn Domestic Hot Water Close DHW tapFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Replace waterGas at burner Check wiring Viewing WindowReplace sensor or PCB E28 Replace gas valveReplace PCB Is there 230V at Replace safety thermostatReplace sensor Pages for Notes Pages for Notes GAS Boiler System Commissioning Checklist Service Record Potterton