v)pumped into an internal discharge branch (e.g. sink waste) downstream of the trap

7.0 Site Requirement

 

Sink

 

50mm

per

 

metre

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

of pipe

run

 

 

 

 

 

 

 

 

 

 

Minimum fall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basement or similar (heated)

Boiler

Condensate Pump

vi) pumped into an external soil & vent pipe

Pipe must terminate above water level but below surrounding surface. Cut end at 45°

7.7Condensate Drain (cont.)

12.A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301. This pump will dispose of both condensate & high temperature water from the relief valve. It has a maximum head of 5 metres. Follow the instructions supplied with the pump.

13.Condensate Drain Pipe ‘Trace Heating’ Elements are available in various lengths. ‘MULTIFIT’ part nos.:-

1 metre 720644401

2 metre 720664101

3 metre 720664201

5 metre 720664401*

*Where the drain is between 3 & 5 metres a 5 metre kit can be used and “doubled back” upon itself.

14.It is possible to fit the element externally on the condensate drain or internally as detailed in the instructions provided.

15.The fitting of a ‘Trace Heating’ Element is NOT a substitute for correct installation of the condensate drain. ALL requirements in this section must still be adhered to.

50mm

per

 

 

 

 

metre

 

 

2.

of pipe

run

 

 

Minimum fall

Unheated Location

 

 

 

 

 

 

(e.g. Garage)

Basement or similar (heated)

Boiler

Condensate Pump

vii)to a drain or gully with extended external run & trace heating

The ‘Trace Heating’ element must be installed in accordance with the instructions supplied.

Boiler External runs & those in unheated locations still require insulation.

50mm

per

 

 

 

metre

 

2.

of pipe

run

 

 

Minimum

 

 

 

fall

 

Pipe must terminate above water level but below surrounding surface. Cut end at 45°

© Baxi Heating UK Ltd 2012

19

Image 19
Contents Installation & Service Instructions Benchmark Scheme Natural GasScheme Members only Installer Notification GuidelinesLegislation Important Installation, Commissioning, Service & RepairCodes of Practice refer to the most recent version Technique Safe Manual HandlingGeneral PreparationContents Introduction Contents of PackDescription Circulation Pump Drain Off Point General LayoutLayout Expansion Vessel Automatic Air VentAppliance Operation Central Heating Mode FigDomestic Hot Water Mode Fig Frost Protection ModeGold Combi 24, 28 & 33 HE a Technical DataDimensions and Fixings Bypass System DetailsInformation Central Heating CircuitSystem Filling and Pressurising Fig Safety Pressure Relief Valve FigExpansion Vessel Central Heating only Showers Domestic Hot Water Circuit FigHard Water Areas At least Site RequirementsLocation Clearances FigsElectrical Supply Site RequirementVentilation of Compartments Gas SupplyRun PerPipe run Minimum Fall Per Metre50mm per Minimum Fall500mm min Minimum fall RunLikely flue positions requiring a flue terminal guard Plume Displacement KitFlue Below windows or openings on pitched roofs 2000Total equivalent length = +B+C+2x90Bends Flue OptionsTotal Equivalent Length = +B+C+1x90Bend Key Accessory Size Code No Flue AccessoriesTelescopic Flue inc. elbow Twin Flue Connection Twin Flue Duct AdaptorAir Duct Connection Flue Duct Connection Boiler Adaptor Terminal Guard Fig Flue DimensionsFor Roof Terminals Flue TrimPlume Displacement Kit Fig Plume DisplacementElbow 28/33Determining Permissible Lengths ExampleGeneral Fitting Notes 50mm30mm Extension and outlet. Secure using two of the screws Elbow to allow the flue to be installed as shown60Ø extension piece. It must be secured using two Using a suitable bit e.g mm, drill throughAfter considering the site requirements InstallationUnpacking & Initial Preparation FlushingFitting the Filling Loop Kit Tighten all the connections Fitting the Safety Pressure Relief Discharge Pipe FigFitting The Boiler Condensate Drain see sectionWall Thickness Waste Flue Fitting The FlueWall Thickness Flue Elbow Ensure Elbow is fully engaged into Boiler Adaptor25mm Extension Cut End Inner Flue Support BracketEnsure Extension is fully engaged into Boiler Adaptor Preliminary Electrical Checks Making The Electrical ConnectionsTerminal Block Cover Cable Clamp Screw Pump Automatic Air Vent Selector Switch DisplayCommissioning Commissioning the BoilerIt is necessary to set the boiler to ‘Calibration Mode’ Temperature Control Selector Switch DisplayTemperature Control Gas Pressure Test Point Gas Valve Check the Operational Working Gas Inlet PressureSetting the Timer Completion CompletionCase Front Panel Facia Panel 13 .1 Annual Servicing ServicingAnnual Servicing Inspection 10 ±1 Electrode PositionIgniter Fig Changing ComponentsSpark and Sensing Electrodes Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan Collector Fan FigVenturi Fig Injector FigInsulation Fig Burner FigExtension Piece Flue/Heat Exchanger Thermostat Sensor Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig DHW Temperature Sensor NTC FigPump Complete Fig Pump Head Only FigAutomatic Air Vent Fig Hall Effect Sensor Fig Pressure Gauge FigsPressure Relief Valve Fig Plate Heat Exchanger Fig Diverter Valve Motor Unit & Assembly Fig14.22 P.C.B. Fig Selector Switch FigExpansion Vessel Fig Gas Valve FigCO2 should be 8.4% ± Reduce CO2 Setting the Gas ValveSetting the Gas Valve CO2 check Flue Adaptor Test Point Plug Analyser ProbeElectrical Illustrated Wiring Diagram315316 311 404419 422 400 415 Short Parts ListShort Parts List 426Initial Fault Finding Checks Fault FindingError Codes Pump runs Error 133 flashingGo to section ‘A’ Turn the selector switch to Reset position for 5 secondsClose DHW tap Error 133 flashing Go to section ‘I’Turn Domestic Hot Water Open DHW tap fullyReplace water PCB X3 connector terminals 3Switch terminal Fan jammed or faulty winding Replace PCBReplace gas valve Check wiring Viewing WindowReplace sensor or PCB E28 Gas at burnerReplace PCB Is there 230V at Replace safety thermostatReplace sensor Pages for Notes Pages for Notes GAS Boiler System Commissioning Checklist Service Record Potterton