Potthof & Co 24kw, 33kw, 28kw manual Minimum Fall, 50mm per, 500mm min

Page 18

iii) Termination to a drain or gully

Boiler

Pipe must terminate above water level but below surrounding surface. Cut end at 45°

50mm

per

 

 

 

 

 

metre

 

2.

of pipe

run

 

 

Minimum

 

 

 

fall

 

7.0Site Requirement

7.7Condensate Drain (cont.)

11.When discharging condensate into a soil stack or waste pipe the effects of existing plumbing must be considered. If soil pipes or waste pipes are subjected to internal pressure fluctuations when WC's are flushed or sinks emptied then back-pressure may force water out of the boiler trap and cause appliance lockout.

Boiler

iv)Termination to a purpose made soakaway Further specific requirements for soakaway design are referred to in BS 6798.

500mm min

50mm per

 

metre of

2.5°

pipe run

Minimum fall

 

Holes in the soak-away must face away from the building

18© Baxi Heating UK Ltd 2012

Image 18
Contents Installation & Service Instructions Natural Gas Benchmark SchemeInstaller Notification Guidelines Scheme Members onlyImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice refer to the most recent version Preparation Safe Manual HandlingGeneral TechniqueContents Contents of Pack IntroductionDescription Expansion Vessel Automatic Air Vent General LayoutLayout Circulation Pump Drain Off PointFrost Protection Mode Central Heating Mode FigDomestic Hot Water Mode Fig Appliance OperationTechnical Data Gold Combi 24, 28 & 33 HE aDimensions and Fixings Central Heating Circuit System DetailsInformation BypassSafety Pressure Relief Valve Fig System Filling and Pressurising FigExpansion Vessel Central Heating only Domestic Hot Water Circuit Fig ShowersHard Water Areas Clearances Figs Site RequirementsLocation At leastGas Supply Site RequirementVentilation of Compartments Electrical SupplyPer Metre PerPipe run Minimum Fall RunMinimum Fall 50mm per500mm min Run Minimum fallBelow windows or openings on pitched roofs 2000 Plume Displacement KitFlue Likely flue positions requiring a flue terminal guardFlue Options Total equivalent length = +B+C+2x90BendsTotal Equivalent Length = +B+C+1x90Bend Flue Accessories Key Accessory Size Code NoTelescopic Flue inc. elbow Twin Flue Duct Adaptor Twin Flue ConnectionAir Duct Connection Flue Duct Connection Boiler Adaptor Flue Trim Flue DimensionsFor Roof Terminals Terminal Guard FigPlume Displacement Plume Displacement Kit FigExample 28/33Determining Permissible Lengths Elbow50mm General Fitting Notes30mm Using a suitable bit e.g mm, drill through Elbow to allow the flue to be installed as shown60Ø extension piece. It must be secured using two Extension and outlet. Secure using two of the screwsFlushing InstallationUnpacking & Initial Preparation After considering the site requirementsFitting the Filling Loop Kit Condensate Drain see section Fitting the Safety Pressure Relief Discharge Pipe FigFitting The Boiler Tighten all the connectionsEnsure Elbow is fully engaged into Boiler Adaptor Fitting The FlueWall Thickness Flue Elbow Wall Thickness Waste FlueInner Flue Support Bracket 25mm Extension Cut EndEnsure Extension is fully engaged into Boiler Adaptor Making The Electrical Connections Preliminary Electrical ChecksTerminal Block Cover Cable Clamp Commissioning the Boiler Selector Switch DisplayCommissioning Screw Pump Automatic Air VentCheck the Operational Working Gas Inlet Pressure Temperature Control Selector Switch DisplayTemperature Control Gas Pressure Test Point Gas Valve It is necessary to set the boiler to ‘Calibration Mode’Setting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingAnnual Servicing Inspection Electrode Position 10 ±1Changing Components Igniter FigSpark and Sensing Electrodes Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Fig Insulation FigExtension Piece DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Head Only Fig Pump Complete FigAutomatic Air Vent Fig Pressure Gauge Figs Hall Effect Sensor FigPressure Relief Valve Fig Diverter Valve Motor Unit & Assembly Fig Plate Heat Exchanger FigSelector Switch Fig 14.22 P.C.B. FigGas Valve Fig Expansion Vessel FigFlue Adaptor Test Point Plug Analyser Probe Setting the Gas ValveSetting the Gas Valve CO2 check CO2 should be 8.4% ± Reduce CO2Illustrated Wiring Diagram Electrical426 Short Parts ListShort Parts List 315316 311 404419 422 400 415Fault Finding Initial Fault Finding ChecksError Codes Reset position for 5 seconds Error 133 flashingGo to section ‘A’ Turn the selector switch to Pump runsOpen DHW tap fully Error 133 flashing Go to section ‘I’Turn Domestic Hot Water Close DHW tapFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Replace waterGas at burner Check wiring Viewing WindowReplace sensor or PCB E28 Replace gas valveReplace safety thermostat Replace PCB Is there 230V atReplace sensor Pages for Notes Pages for Notes GAS Boiler System Commissioning Checklist Service Record Potterton