Potthof & Co 28kw, 24kw, 33kw manual Electrode Position, 10 ±1

Page 41

Burner

Sensing Electrode

 

 

 

±

1

 

.

5

 

7

 

 

 

 

 

 

5 . 0 ±

4

Viewing Window

Spark Ignition

Electrode

10 ±1

 

 

13.0 Servicing

 

 

 

 

 

 

 

 

Annual Servicing - Inspection (Cont)

13.2

6.

Undo the nut on the gas inlet pipe to the venturi (Fig. 77)

and pull the sensing pipe off the fan.

7.

Disconnect the electrode leads, noting their position, and

the fan electrical plugs.

8.

Undo the four nuts retaining the combustion box cover

to the heat exchanger.

9.

Carefully draw the fan, collector and cover assembly

forward, being careful to retain the injector in the venturi

Electrode Position

Fan, Collector and Cover

Assembly

Electrode

Leads

Fig. 76

Venturi

Injector

 

Threaded

Fig. 78

 

Bush

 

Fig. 77

Gas Inlet Pipe

 

Hall Effect

 

 

Sensor

Blanking

Cold Water

 

 

Cap

Inlet Tap

Restricter

Hydraulic Inlet

Assembly

Fig. 79

Filter

(Figs. 76 & 77).

10.

Clean any debris from the heat exchanger and check

that the gaps between the tubes are clear.

11.

Inspect the burner, electrodes and insulation, cleaning or

replacing if necessary. Clean any dirt or dust from the air

box.

12.

Reassemble in reverse order.

NOTE: The sensing pipe must be reconnected to the fan, not the venturi.

DHW Filter (Fig. 79)

13.If the flow of domestic hot water is diminished, it may be necessary to clean the filter.

14.Initially check the cold water inlet tap filter.

15.Turn the tap off and draw off from a hot tap. Undo the blanking cap and remove the threaded bush (Fig. 78).

16.Extract the filter and rinse thoroughly in clean water. Reassemble and check the flow. If required clean the restricter filter as described below.

17.Pull off the Hall Effect sensor. Undo the restricter from the inlet/return manifold (Fig. 79).

18.Rinse the filter thoroughly in clean water and reassemble in reverse order.

19.Turn the selector switch fully anticlockwise against the spring pressure to the reset position and hold for 5 seconds to reset the boiler.

20.Complete the relevant Service Interval Record section of the Benchmark Commissioning Checklist at the rear of this publication and then hand it back to the user.

© Baxi Heating UK Ltd 2012

41

Image 41
Contents Installation & Service Instructions Benchmark Scheme Natural GasScheme Members only Installer Notification GuidelinesCodes of Practice refer to the most recent version Important Installation, Commissioning, Service & RepairLegislation General Safe Manual HandlingPreparation TechniqueContents Description Contents of PackIntroduction Layout General LayoutExpansion Vessel Automatic Air Vent Circulation Pump Drain Off PointDomestic Hot Water Mode Fig Central Heating Mode FigFrost Protection Mode Appliance OperationGold Combi 24, 28 & 33 HE a Technical DataDimensions and Fixings Information System DetailsCentral Heating Circuit BypassExpansion Vessel Central Heating only Safety Pressure Relief Valve FigSystem Filling and Pressurising Fig Hard Water Areas Domestic Hot Water Circuit FigShowers Location Site RequirementsClearances Figs At leastVentilation of Compartments Site RequirementGas Supply Electrical SupplyPipe run Minimum Fall PerPer Metre Run500mm min Minimum Fall50mm per Minimum fall RunFlue Plume Displacement KitBelow windows or openings on pitched roofs 2000 Likely flue positions requiring a flue terminal guardTotal equivalent length = +B+C+2x90Bends Flue OptionsTotal Equivalent Length = +B+C+1x90Bend Telescopic Flue inc. elbow Flue AccessoriesKey Accessory Size Code No Air Duct Connection Flue Duct Connection Boiler Adaptor Twin Flue Duct AdaptorTwin Flue Connection For Roof Terminals Flue DimensionsFlue Trim Terminal Guard FigPlume Displacement Kit Fig Plume DisplacementDetermining Permissible Lengths 28/33Example Elbow30mm 50mmGeneral Fitting Notes 60Ø extension piece. It must be secured using two Elbow to allow the flue to be installed as shownUsing a suitable bit e.g mm, drill through Extension and outlet. Secure using two of the screwsUnpacking & Initial Preparation InstallationFlushing After considering the site requirementsFitting the Filling Loop Kit Fitting The Boiler Fitting the Safety Pressure Relief Discharge Pipe FigCondensate Drain see section Tighten all the connectionsWall Thickness Flue Elbow Fitting The FlueEnsure Elbow is fully engaged into Boiler Adaptor Wall Thickness Waste FlueEnsure Extension is fully engaged into Boiler Adaptor Inner Flue Support Bracket25mm Extension Cut End Terminal Block Cover Cable Clamp Making The Electrical ConnectionsPreliminary Electrical Checks Commissioning Selector Switch DisplayCommissioning the Boiler Screw Pump Automatic Air VentTemperature Control Gas Pressure Test Point Gas Valve Temperature Control Selector Switch DisplayCheck the Operational Working Gas Inlet Pressure It is necessary to set the boiler to ‘Calibration Mode’Setting the Timer Case Front Panel Facia Panel CompletionCompletion Annual Servicing Inspection Servicing13 .1 Annual Servicing 10 ±1 Electrode PositionSpark and Sensing Electrodes Fig Changing ComponentsIgniter Fig Venturi Fig Fan FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorExtension Piece Burner FigInsulation Fig Safety Thermostat Fig Central Heating Temperature Sensor NTC FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigAutomatic Air Vent Fig Pump Head Only FigPump Complete Fig Pressure Relief Valve Fig Pressure Gauge FigsHall Effect Sensor Fig Plate Heat Exchanger Fig Diverter Valve Motor Unit & Assembly Fig14.22 P.C.B. Fig Selector Switch FigExpansion Vessel Fig Gas Valve FigSetting the Gas Valve CO2 check Setting the Gas ValveFlue Adaptor Test Point Plug Analyser Probe CO2 should be 8.4% ± Reduce CO2Electrical Illustrated Wiring DiagramShort Parts List Short Parts List426 315316 311 404419 422 400 415Error Codes Fault FindingInitial Fault Finding Checks Go to section ‘A’ Turn the selector switch to Error 133 flashingReset position for 5 seconds Pump runsTurn Domestic Hot Water Error 133 flashing Go to section ‘I’Open DHW tap fully Close DHW tapSwitch terminal PCB X3 connector terminals 3Fan jammed or faulty winding Replace PCB Replace waterReplace sensor or PCB E28 Check wiring Viewing WindowGas at burner Replace gas valveReplace sensor Replace safety thermostatReplace PCB Is there 230V at Pages for Notes Pages for Notes GAS Boiler System Commissioning Checklist Service Record Potterton