GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This does not affect the customer’s statutory rights
Customer Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Telephone Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
Address |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
Boiler Make and Model |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Boiler Serial Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
Commissioned by (print name) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Gas Safe Register Number |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||
Company Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Telephone Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||
Company Address |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Commissioning Date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
To be completed by the customer on receipt of a Buildings Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
CONTROLS Tick the appropriate boxes |
|
|
|
|
|
|
|
| |
Time and Temperature Control to Heating | Room Thermostat and |
| Programmable |
| Load/Weather | Optimum Start | |||
|
| Programmer/Timer | Room Thermostat |
| Compensation |
| Control | ||
Time and Temperature Control to Hot Water |
|
| Cylinder Thermostat and Programmer/Timer | Combination Boiler | |||||
Heating Zone Valves |
|
|
|
| Fitted | Not Required | |||
Hot Water Zone Valves |
|
|
|
| Fitted | Not Required | |||
Thermostatic Radiator Valves |
|
|
|
| Fitted | Not Required | |||
|
|
|
|
|
|
| |||
Automatic Bypass to System |
|
|
|
| Fitted | Not Required | |||
|
|
|
|
|
|
|
| ||
Boiler Interlock |
|
|
|
|
|
| Provided | ||
|
|
|
|
|
|
|
|
|
|
| ALL SYSTEMS |
|
|
|
|
|
|
|
|
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions |
|
| Yes | ||||||
What system cleaner was used? |
|
|
|
|
|
|
|
| |
What inhibitor was used? |
|
|
|
|
| Quantity | litres | ||
| CENTRAL HEATING MODE Measure and Record: |
|
|
|
|
|
|
| |
Gas Rate |
|
| m3/hr |
| OR |
| ft3/hr | ||
Burner Operating Pressure (if applicable) |
|
| mbar |
| OR | Gas Inlet Pressure | mbar | ||
Central Heating Flow Temperature |
|
|
|
|
|
| °C | ||
|
|
|
|
|
|
|
|
| |
Central Heating Return Temperature |
|
|
|
|
|
| °C | ||
|
|
|
|
|
|
|
|
| |
COMBINATION BOILERS ONLY |
|
|
|
|
|
|
|
| |
Is the installation in a hard water area? (above 200ppm) |
|
|
|
| Yes | No | |||
|
|
|
|
|
|
| |||
If yes and if required by the manufacturer, has a water scale reducer been fitted? |
|
|
| Yes | No | ||||
|
|
|
|
|
|
|
|
| |
What type of scale reducer has been fitted? |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
DOMESTIC HOT WATER MODE Measure and Record |
|
|
|
|
|
|
| ||
Gas Rate |
|
| m3/hr | OR |
|
| ft3/hr |
| |
Burner Operating Pressure (at maximum rate) |
|
| mbar | OR | Gas Inlet Pressure (at maximum rate) | mbar | |||
Cold Water Inlet Temperature |
|
|
|
|
|
| °C |
| |
Hot Water has been checked at all outlets |
|
|
|
| Yes | Temperature | °C | ||
|
|
|
|
|
|
|
|
| |
Water Flow Rate |
|
|
|
|
|
| l/min | ||
CONDENSING BOILERS ONLY |
|
|
|
|
|
|
|
| |
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5545/BS6798 |
| Yes | |||||||
|
|
|
| ||||||
If the condensate pipe terminates externally, has the pipe diameter been increased and weatherproof insulation fitted? |
| Yes | |||||||
|
|
|
|
|
|
|
|
| |
ALL INSTALLATIONS |
|
|
|
|
|
|
|
| |
If required by the manufacturer, record the following | CO2 | % OR CO | ppm | OR CO/CO2 Ratio |
| ||||
The heating and hot water system complies with the appropriate Building Regulations |
|
|
| Yes |
| ||||
The boiler and associated products have been installed and commissioned in accordance with manufacturer’s instructions |
| Yes |
| ||||||
The operation of the boiler and system controls have been demonstrated to and understood by the customer |
|
| Yes |
| |||||
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer |
| Yes |
|
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
62
c Heating and Hotwater Industry Council (HHIC) | www.centralheating.co.uk |