APC UCCS Temperature Control specifications Work Included

Page 4

and approval.

D. Coordination: This Contractor shall interface with controls furnished with equipment. Provide additional control devices, interlock relays, and signal conditioners when necessary to accomplish specified sequences.

E.The system shall include all interlocks, field devices, wiring, piping, hardware, and software required to provide a complete, functional system in accordance with these specifications and drawings.

F.The distribution of points and the type of controllers shown on the control panels depicted on the Contract Documents show the actual layout to be used by the Contractor when bidding and installing the controls. It is the Contractor’s responsibility to include in his bid the cost of any additional controllers necessary for a complete job, conforming to specifications.

G. If pneumatic controls are to be used, the Controls Contractor shall coordinate with the Fire Alarm Contractor to connect the air supply to all pneumatic controls for fire/smoke dampers and elevator-shaft ventilation dampers. The Controls Contractor shall install air- supply lines to the E/Ps controlling the pneumatic damper actuators, and make all required pneumatic connections to the damper actuators and E/Ps. The Fire Alarm Contractor is responsible for providing, installing and wiring the E/Ps. The Electrical Contractor, under Division 16, shall supply power to EP Enclosure.

1.04WORK INCLUDED

A.Furnishing and installing a complete, fully functional control system per this specification and the Construction Documents (drawings, specifications, addenda, etc.).

B.Pre-assembled control panels.

C.Actuators, thermostats, sensors, transmitters, thermowells, instrument air compressors, filter/dryers, gauges, and mounting hardware as applicable.

D.Control valves, dampers, linkages, and mounting hardware.

E.Construction supervision.

F.Startup and performance testing.

G.Demonstration and training.

H.Warranty.

I. Demolition:

When equipment wiring, piping, pneumatics, tubing, telecommunications, cables etc. are abandoned or disconnected, they must be physically removed and disposed of in a professional manner. In cases where the demo could have an adverse effect, or where the

JANUARY 2008

UCCS STANDARDS

15950-4

Image 4
Contents Uccs Temperature Control Specifiers Guide Section Controls Part 1 General Special Conditions Work Included Definitions Drawings and SpecificationsSubmittal Data and Shop Drawings 15950-6 15950-7 Project Record Documents Demonstration and Training Warranty Quality Assurance Ownership of Proprietary MaterialPart 2 Products Manufacturers 15950-13 15950-14 Duct-mounted Uccs to add preferred manufacturer here 15950-16 AIR Tubing and Control Wiring Control Valves15950-18 Local Control Panels Compressed AIR Supply Pneumatic Actuators and Positioners Pneumatic 15950-22 15950-23 15950-24 SOLID-STATE Sensing Devices Transmitters Solid State15950-26 Auxiliary Devices Electric Actuators Electric Safety Controls Part 3 Execution CONTROL-AIR PipingControl Piping Liquids Control Wiring NET Controllers SCX 920 LCX 810, TCX 850, LCX 800I ALL Infinity ControllersInstallation and Setup Requirements 15950-34 Control Device Locations Control Panels IdentificationTesting CleanupProtection 15950-38 Control Execution General Workstation Programming 15950-41 DDC Software END of Section