APC UCCS Temperature Control specifications Demonstration and Training

Page 9

B.Prior to Final Completion of the installation, prepare complete Operation and Maintenance manuals. Refer to Division 1, Section 01300, and Division 15, Section 15050, for require- ments. Also provide one set of digital media containing all CAD-prepared drawings. The file format shall conform to the requirements in the most current version of Division 00050 of the UCCS Construction Standards (Computer - Aided

Drafting and Facilities Management Standards). A copy is available upon request.

1.Temperature control diagrams including an explanation of the control sequence of each system along with the following instruction wherever applicable.

a.Emergency procedures for fire or failure of major equipment. b. Normal starting, operating and shutdown.

c. Summer or winter shutdown.

3.A reduced copy of the controller drawing, listing all input and output points with functional descriptions, shall be placed inside the door to each controller enclosure in a plastic pocket attached to the door. The sheet shall be laminated. One sheet is required for each controller housed in the enclosure.

[Note to the Consultant: The two following items shall be included as requested by the University. The facility has the described documentation from previous projects.]

1.09DEMONSTRATION AND TRAINING

A. This Contractor shall provide a minimum of ** hours [Note to Consultant: Enter the required amount of training time required for the job. Consult with UCCS-FM staff to determine the amount of time needed. Factors to consider are the complexity of the installation, any uncommon features, new programs or sequences, unique hardware, etc. Specify a minimum of four hours.] of system and control dem- onstration time at the job site for the Owner's personnel.

B. This Contractor shall provide at least ** hours [Note to consultant: See the note in 1.09A. Specify a minimum of four hours.] of classroom training sessions at times and location as directed by the Owner. The training shall focus on design, operation, and maintenance procedures of the products installed.

C. The instructor(s) for the above sessions shall be employee(s) of the Control Contractor whose primary function is customer training and applications support.

D. A minimum of two copies of the most current control drawings shall be provided to the UCCS HVAC Shop before the training begins. These shall be in addition to the drawings to be provided under Paragraph 1.08, if the O&M Manuals have not been turned in to the Architect before the time of the training.

E. The training may be phased. The Owner may elect to conduct training and demonstration in

JANUARY 2008

UCCS STANDARDS

15950-9

Image 9
Contents Uccs Temperature Control Specifiers Guide Section Controls Part 1 General Special Conditions Work Included Drawings and Specifications DefinitionsSubmittal Data and Shop Drawings 15950-6 15950-7 Project Record Documents Demonstration and Training Warranty Ownership of Proprietary Material Quality AssurancePart 2 Products Manufacturers 15950-13 15950-14 Duct-mounted Uccs to add preferred manufacturer here 15950-16 Control Valves AIR Tubing and Control Wiring15950-18 Local Control Panels Compressed AIR Supply Pneumatic Actuators and Positioners Pneumatic 15950-22 15950-23 15950-24 Transmitters Solid State SOLID-STATE Sensing Devices15950-26 Auxiliary Devices Electric Actuators Electric Part 3 Execution CONTROL-AIR Piping Safety ControlsControl Piping Liquids Control Wiring SCX 920 LCX 810, TCX 850, LCX 800I ALL Infinity Controllers NET ControllersInstallation and Setup Requirements 15950-34 Control Device Locations Identification Control PanelsCleanup TestingProtection 15950-38 Control Execution General Workstation Programming 15950-41 END of Section DDC Software