APC UCCS Temperature Control specifications DDC Software, END of Section

Page 42

temperature controls contractor. The contractor shall confirm that the communication network linking controllers within the [Add building name] functions properly, before connecting the new controllers to the campus network.

3.15DDC SOFTWARE

A. Provide sufficient internal memory for the specified control sequences and logging. There shall be a minimum of 15% of available memory free for future use.

END OF SECTION

JANUARY 2008

UCCS STANDARDS

15950-42

Image 42
Contents Uccs Temperature Control Specifiers Guide Section Controls Part 1 General Special Conditions Work Included Drawings and Specifications DefinitionsSubmittal Data and Shop Drawings 15950-6 15950-7 Project Record Documents Demonstration and Training Warranty Quality Assurance Ownership of Proprietary MaterialPart 2 Products Manufacturers 15950-13 15950-14 Duct-mounted Uccs to add preferred manufacturer here 15950-16 AIR Tubing and Control Wiring Control Valves15950-18 Local Control Panels Compressed AIR Supply Pneumatic Actuators and Positioners Pneumatic 15950-22 15950-23 15950-24 SOLID-STATE Sensing Devices Transmitters Solid State15950-26 Auxiliary Devices Electric Actuators Electric Safety Controls Part 3 Execution CONTROL-AIR PipingControl Piping Liquids Control Wiring NET Controllers SCX 920 LCX 810, TCX 850, LCX 800I ALL Infinity ControllersInstallation and Setup Requirements 15950-34 Control Device Locations Control Panels IdentificationCleanup TestingProtection 15950-38 Control Execution General Workstation Programming 15950-41 DDC Software END of Section