Genie PCG, GCG, H Pared DE Control DEL Instalación, Murale commande la de l’arrière À, Borne la à

Page 38

.cionamiento -fun mal el causará operador por iluminado pared de control un de Más .iluminado no tipo del ser deben adicionales pared de controles sus iluminado,todos pared de control un tiene usted Si .ILUMINADO TIPO DEL SEA QUE PUEDE PARED DE CONTROLES SUS DE UNO SOLO .agente del disponibles hay adicionales pared de NOTA:Controles

.pared de control del cerca pared, la en etiqueta la Pegar – .4)-5 .(Fig"atrapamiento" de advertencia de etiqueta la de protector interno forro el Quitar •

1" x #4 ]

45

 

 

 

[

 

 

33

[

 

 

1/4"-1 x #6 ]

 

 

 

.3)-5 .(Fig45) el usa consola

 

 

(la 33) el usa pared de botón (el tornillos 2

 

 

con pared la a pared de control el Sujetar

 

 

 

.Montaje

.3

.2)-5 .(Fig"W" terminal al blanco cable el

 

 

y "B", terminal al pelado cable el Acoplar

 

 

 

pared: de control del Atrás

 

.1)-5 .(Fig#2 terminal al blanco cable el

 

 

y #1 terminal al pelado cable el Acoplar

 

 

 

 

control: de caja la En

 

 

 

.5)-4 .(Fig

 

 

cable del extremos los pelar y Partir

 

.proveen se que aisladas grapas las usando

 

 

raso cielo al segura manera de Apretar

 

 

 

.pared de control

 

 

al control de caja la de cable el Instalar

 

 

 

.Cableado

.2

).pared de control el en estando puerta

 

 

la alcanzar de capaz ser debe (Usted

 

 

móviles partes las de alejado estar Debe

 

 

.puerta la funcionar hagan pequeños

 

 

niños los que impedir para piso del

 

 

arriba pies 5 a menos lo por estar Debe

 

 

.puerta la de visual línea

 

 

la en estar debe escoja que lugar El

 

 

.pared de control del montaje

 

 

el para conveniente lugar un Escoger

 

 

 

 

.montaje para lugar el Encontrar

.1

 

 

 

PIEZAS DE AZUL BOLSA LA ABRIR

 

 

 

 

 

 

 

 

 

.apretado cable el

 

 

 

 

sostener para necesario sea como ajustadas

 

 

 

 

tan solamente aprieten se que de asegurarse

 

 

 

 

aisladas, grapas las usar Al .funcionar

 

 

 

 

de deje pared de control el que hacer

 

 

 

 

pueden pinchados o cortados cables Los

 

 

 

 

.sola sí por funcione puerta la que hacer podría

 

 

 

 

y funcione luz la que impedirá suministrado

 

 

 

 

tipo del sea no que pared de control un Usar

 

 

 

 

PRECAUCIÓN

 

19

 

 

 

 

 

 

 

 

 

 

 

 

.pared de control del cables los instalar

 

 

 

de antes eléctrica alimentación tenga

 

 

 

 

no puerta la de operador el que Verificar

 

 

 

ADVERTENCIA

 

 

 

 

 

 

.atrapamiento de advertencia de Etiqueta

 

 

 

.coinçage de

 

 

cas en d’avertissement Étiquette

4-4 .FIG

 

 

 

 

 

.pared de control del Montaje

 

.murale commande la de Montage

3-4 .FIG

 

 

 

 

 

 

 

 

pared

 

 

de control al cables de Acoplamiento

 

 

 

.murale commande la à Connexion

2-4 .FIG

 

 

consola

 

 

botón

 

 

 

 

 

Bouton

 

 

 

Console

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.control

 

de caja la a terminales de Acoples

 

 

.motorisée tête la à Connexion

1-4 .FIG

2

1

 

 

.correctement fonctionner

pas pourra ne dernier opérateur,ce par

lumineuses murales commandes plusieurs

avez vous Si .l’être peut ne commande

autre lumineuse,aucune murale commande

une avez vous Si .LUMINEUSE ÊTRE PEUT

MURALES COMMANDES VOS DE SEULE UNE

.supplémentaires murales commandes des

pour dépositaire le REMARQUE:Contacter

 

 

.murale commande

 

 

la de près mur au l’étiquette Coller

 

 

 

 

.4)-4 .(Fig

 

 

coinçage de cas en d’avertissement

 

 

l’étiquette de protection de l’endos Enlever

 

1" x #4 ]45[

 

 

1/4"-1 x #6 ]

33

[

 

 

 

 

 

.3)-4 .(Fig[45]) utiliser console, la pour

 

 

et [33] utiliser mural, bouton (le vis deux de

 

 

l’aide à mur au murale commande la Fixer

 

 

 

.Montage

.3

.2)-4 .(FigW borne la à blanc

 

 

fil le et B borne la à rayé fil le Fixer

 

 

:murale commande la de l’arrière À •

.1)-4 .(Fig 2 borne la à

 

blanc fil le et 1 borne la à rayé fil le Fixer

 

 

 

: motorisée tête la Sur

 

 

5)-3 .(Fig

 

 

 

fils des l’extrémité dénuder et Séparer

 

 

.fournies isolées

 

 

 

agrafes des l’aide à plafond au fixer Bien

 

 

.murale commande

 

 

 

la à motorisée tête la de fil le Acheminer

 

 

Câblage

.2

 

.murale) commande la devant

 

 

 

 

tenez vous vous lorsque porte la toucher

 

 

 

 

de impossible être doit il exemple,

 

 

 

(par mobiles pièces toutes de Loin

 

 

 

.l’atteindre

 

 

 

 

pas puissent n’y enfants jeunes les que

 

 

 

afin m 1,5 de minimale hauteur une À

 

 

 

.porte la de

 

 

 

vue la à trouver se doit L’emplacement

 

 

 

.murale commande la de montage le pour

 

 

 

pratique emplacement un Sélectionner

 

 

.montage du l’emplacement de Repérage

.1

 

PIÉCES DES BLEU SAC LE OUVRIR

 

 

 

 

 

 

 

.excès sans fils les maintenir bien

 

 

pour suffisamment serrer à veiller isolées,

 

 

d’agrafes l’utilisation de Lors .murales

 

 

commandes des fonctionnement le

 

 

interrompre peuvent pincés ou coupés fils

 

 

Les .porte la de inattendu fonctionnement

 

 

le et l’éclairage de fonctionnement-non

 

 

le entraîner peut fourni type le que

 

 

autre murale commande de L’utilisation

 

 

GARDE EN MISE

 

 

 

 

 

 

 

 

 

 

 

.murales commandes

 

des fils les d’installer avant tension

 

sous pas n’est l’opérateur que Vérifier

 

AVERTISSEMENT

 

 

 

 

 

 

 

 

COM.COMPANY GENIE O 3643.354.800.1 AYUDA PARA

COM.GENIECOMPANY À SITE NOTRE VISITER OU 3643.354.800.1-LE COMPOSER ASSISTANCE, TOUTE POUR

PARED DE CONTROL DEL INSTALACIÓN

4

MURALES COMMANDES DES INSTALLATION

Image 38
Contents Garage Door Operator PRE-INSTALLATION Check List Typical Sectional Door Installation Typical 1-PIECE Door InstallationSafety Features Table of ContentsOperator Features Recommended Tools Parts Identification Not Shown Full SizePiece Rail Hardware Exploded View Safety Information Parts ListPower Head Exploded View Operator Assembly Slip opposite no knot end through knob Attach rail to power headSlip carriage into carriage slot of rail Attach emergency release tagAttach limit switches Attach limit switch wiresFinding header bracket mounting location InstallationHeader and Door Mounting Brackets Marking final heightFinding door bracket mounting location Door Bracket12 2. Mounting the header bracket Mounting the door bracketMounting the Operator Connecting the arms Attach the armsSAFE-T-BEAM System Installation Wiring Check the followingWall Control Installation Finding the mounting locationWith Grounded Plug Connecting to PowerWith Permanent Wiring Instructions for electricianAdjusting Open force Limit Switch / Force AdjustmentAdjusting limit switches Adjusting Close forceProgramming Remote Controls Single Button Remote Contact Reverse TestLost or Stolen Remote Light BULB/LENS InstallationMULTI-BUTTON Remote Door springs and hardware Maintenance Routine Monthly MaintenanceTroubleshooting Guide Door balanceNot move Operator runsBut door does Door operatorWiring Diagram Transmitter Compliance StatementDistributor Please have part number and credit card readyGarage Door Operator Accessories Order Form Genie CompanyLimited Warranty Ayuda Para Produit le acheté initialement Brevets d’autres pour effectuée DemandeMexique au ou Canada au Unis,-Etats aux achetés Genie Temps de combien PendantCableado DE Diagrama Connexion DE SchémaRemonte Mantenimiento de secciónProblème Raison sansVerde .L.D Rojo .L.D Problemas DE Solución LA Para GuíaMantenimiento Verte del Rouge del Dépannage DE GuideEntretien Chariot duREMOTO, Control DEL Instalación ET Pile DE Changement TélécommandePince LA DE Installation LentePared Télécommandes DES ProgrammationProgramación DE Remotos Controles Inversión DE Contacto DE PruebaFig corredizo Abrir de límiteFuerza LA DE Ajuste / Limitador Interruptor Tornillo Vis Eléctrica Alimentación LA ConectarCiego agujero BranchementPared DE Control DEL Instalación Murale commande la de l’arrière ÀMurales Commandes DES Installation Borne la àSensor del AjustadasNecesario Control de1 x 16-#10 BEAM-T-SAFE Systeme DU InstallationBEAM-T-SAFE Sistema DEL Instalación ’extensionPorte LA DE Bras LES Installer 12-2 .FigOperador DEL Montaje Precaución Garde EN MisePuerta LA DE Montaje DEL Travesaño DEL Cartelas InstallaciónInstallation Porte DE Montage DE ET Linteau DE SupportsRiel del RailEsquina 7,-1 .Fig Rail duTroisième Operador DEL Conjunto’OPÉRATEUR DE Assemblage DeuxièmeSeguridad DE Información Control DE Caja LA DE Piezas DE ListaPiezas DE Lista Motorisée Tète Éclatée VUEMotorisée Tète LA DE Pièces DES Nomenclature Sécurité LA À Relatives InformationsPièces DES Nomenclature ArtRiel DEL Herraje DEL Aumentada Vista Éclatée VUE Rail DU QuincaillerieRiel DEL Herraje DEL Aumentada Vista Éclatée VUE Rail DU QuincailleriePiezas DE Identificación Recommande OutilsSujetadores Attaches Recomendar HerramientasModelos algunos con incluida iluminada pared de Consola Operador DEL Características ÍndiceSeguridad DE Características Modelos algunos con incluidoMatières DES Table Sécurité DE Caractéristiques’OPÉRATEUR DE Caractéristiques Monopièce Porte DE Installation Lentamente muy bajar o está, donde quedarse debe puerta La Votre sur l’installation pour 2-GER d’urgence déclenchementDe obligé certainement serez Vous .montage de emplacement De sistema del montaje de lugar el si ver para VerificarPuertas de

GCG, H, PCG specifications

Genie PCG, H, and GCG represent a series of innovative computing devices designed to meet the diverse needs of modern users. Each model caters to specific requirements, yet they share common technological foundations that enhance performance, user experience, and energy efficiency.

The Genie PCG offers a powerhouse performance with its state-of-the-art processors and an emphasis on portability. It is designed for professionals and students who require a reliable device for multitasking, whether it’s for running demanding applications or standard productivity software. Equipped with a high-resolution display and a backlit keyboard, the PCG delivers an immersive visual experience and usability in low-light conditions. Its lightweight and slim design make it highly portable, making it easy to carry around without compromising performance.

On the other hand, the Genie H is specifically tailored for home users. It focuses on providing a seamless entertainment experience, equipped with integrated graphics and sound technologies that enhance media consumption. Whether you're streaming your favorite shows, playing games, or connecting with friends and family through video calls, the Genie H ensures superior visuals and crystal-clear audio. Its larger screen size complements its use as a central hub for home entertainment, featuring smart connectivity options that allow users to connect various devices effortlessly.

The Genie GCG is the advanced computing solution for gamers and tech enthusiasts. This model stands out with its high-performance graphics card and advanced cooling technology, ensuring optimal gaming performance even under heavy loads. The GCG is designed to handle the latest games, with high refresh rates and low latency delivering an immersive gaming experience. Its customizable RGB lighting and premium materials offer a stylish aesthetic that appeals to a wide range of users.

All three models utilize advanced connectivity options such as Wi-Fi 6 and Bluetooth 5.0, ensuring fast and stable connections. High-capacity batteries and power-efficient components enhance battery life across the series, allowing users to work or play for extended periods without interruption. With robust security features incorporated into the Genie devices, including biometric authentication and hardware encryption, users can feel confident in the safety of their data.

In summary, the Genie PCG, H, and GCG showcase the latest in technology and design, offering tailored experiences for professional, personal, and gaming use. Each model embodies the balance between cutting-edge performance and user-centric features, making them compelling choices in today's competitive computing landscape.