Emerson 00825-0100-4530 Rev EC manual Contents, March

Page 3
March 2013

March 2013

Quick Installation Guide

 

 

 

 

 

 

 

 

 

 

 

 

Any substitution of non-authorized parts or repair, other than exchanging the complete transmitter head or probe assembly, may jeopardize safety and is prohibited.

Unauthorized changes to the product are strictly prohibited as they may unintentionally and unpredictably alter performance and jeopardize safety. Unauthorized changes that interfere with the integrity of the welds or flanges, such as making additional perforations, compromise product integrity and safety. Equipment ratings and certifications are no longer valid on any products that have been damaged or modified without the prior written permission of Emerson Process Management. Any continued use of product that has been damaged or modified without prior written authorization is at the customer's sole risk and expense.

Eliminate the risk of ESD discharge prior to dismounting the transmitter head from the probe.

Probes may generate an ignition- capable level of electrostatic charge under extreme conditions.

During any type of installation or maintenance in a potentially explosive atmosphere the responsible person should make sure that any ESD risks are eliminated before attempting to separate the probe from the transmitter head.

Contents

Confirm system readiness . . . . . . . . . . . . . . . . . 4 Safety Instrumented Systems (4-20 mA only) 21 Mount the transmitter head/probe . . . . . . . . . 5 Product certifications . . . . . . . . . . . . . . . . . . . . 25 Connect the wiring . . . . . . . . . . . . . . . . . . . . . . . 8

Configure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

3

Image 3
Contents Level and Interface Transmitter 00825-0100-4530,Rev EC MarchQuick Installation Guide Superior Performance Guided Wave RadarAbout this guide Quick Installation GuideProbes with non-conductingsurfaces March ContentsConfirm correct Device Driver Switch HART revision modeStep 1: Confirm system readiness Confirm HART revision capabilityTri-Clamptank connection Step 2 Mount the transmitter head/probeTank connection with flange Threaded tank connectionStep 2 continued Bracket mounting, on wallBracket mounting, on pipe Step 2 continued Remote housingGrounding Step 3 Connect the wiringTerminal block To connect the transmitterStep 3 continued Non-intrinsicallysafe power supplyIntrinsically safe power supply HART communicationPower Transient protection terminal blockQuick Installation Guide PowerInstallations Load limitationsQuick Installation Guide Non-HazardousInstallationsStep 3 continued FOUNDATION fieldbus Non-intrinsicallysafe power supplyIntrinsically safe power supply Step 3 continued RS-485with Modbus communicationPower Consumption 0.5 W with HART address = Quick Installation GuideInstalling the Rosemount Radar Master software Step 4 Configure1Only for HART communication Run WizardFOUNDATION fieldbus parameters FOUNDATION fieldbus parameters FOUNDATION fieldbus parameters 3.Click Modbus Setup Setup - Modbus communication parametersSafety Instrumented Systems 4-20mA only InstallationConfiguration Write protection Alarm and saturation levelsTable 3. Alarm levels and operation values DampingOperation and maintenance Site acceptanceProof test Visual inspection SpecificationsInspection ReferencesNorth-Americancertifications Safety Instrumented Systems SISProduct certifications EU conformityI5, IE1 Intrinsically safe and FISCO model Canadian Standards Association CSA approvalsQuick Installation Guide Dual seal maintenanceSpecial conditions for safe use European certificationsATEX approvals MarchSpecial conditions for safe use Brazilian certificationsINMETRO approvals Quick Installation GuideIB1 FISCO model Chinese certificationsMarch I21 Intrinsically safeN3 Type n Japanese certificationsQuick Installation Guide IC1 FOUNDATION fieldbus FISCO modelSpecial conditions for safe use IECEx certificationsIECEx approvals MarchSuitability for intended use Other certificationsOverfill protection Quick Installation GuideMarch EC Declaration of ConformityFigure 1. EC Declaration of Conformity - page Quick Installation GuideFigure 2. EC Declaration of Conformity - page Quick Installation GuideMarch Figure 3. EC Declaration of Conformity - page Quick Installation GuideMarch Emerson Process Management Rosemount Measurement Quick Installation Guide00825-0100-4530 00825-0100-4530,Rev EC March