Emerson
00825-0100-4530 Rev EC
manual
Damping, Alarm and saturation levels, Write protection
Specs
Install
Alarm and saturation levels
Symbol
Connect the wiring
Maintenance
Configure
Click Modbus Setup
Limited Power Supply
Switch HART revision mode
Page 22
Page 21
Page 23
Image 22
Page 21
Page 23
Contents
Superior Performance Guided Wave Radar
00825-0100-4530,Rev EC March
Quick Installation Guide
Level and Interface Transmitter
Quick Installation Guide
About this guide
Probes with non-conductingsurfaces
Contents
March
Confirm HART revision capability
Switch HART revision mode
Step 1: Confirm system readiness
Confirm correct Device Driver
Threaded tank connection
Step 2 Mount the transmitter head/probe
Tank connection with flange
Tri-Clamptank connection
Bracket mounting, on wall
Step 2 continued
Bracket mounting, on pipe
Remote housing
Step 2 continued
Step 3 Connect the wiring
Grounding
To connect the transmitter
Terminal block
HART communication
Non-intrinsicallysafe power supply
Intrinsically safe power supply
Step 3 continued
Power
Transient protection terminal block
Quick Installation Guide
Power
Non-HazardousInstallations
Load limitations
Quick Installation Guide
Installations
Non-intrinsicallysafe power supply
Step 3 continued FOUNDATION fieldbus
Intrinsically safe power supply
Quick Installation Guide
RS-485with Modbus communication
Power Consumption 0.5 W with HART address =
Step 3 continued
Step 4 Configure
Installing the Rosemount Radar Master software
Run Wizard
1Only for HART communication
FOUNDATION fieldbus parameters
FOUNDATION fieldbus parameters
FOUNDATION fieldbus parameters
Setup - Modbus communication parameters
3.Click Modbus Setup
Installation
Safety Instrumented Systems 4-20mA only
Configuration
Damping
Alarm and saturation levels
Table 3. Alarm levels and operation values
Write protection
Site acceptance
Operation and maintenance
Proof test
References
Specifications
Inspection
Visual inspection
EU conformity
Safety Instrumented Systems SIS
Product certifications
North-Americancertifications
Dual seal maintenance
Canadian Standards Association CSA approvals
Quick Installation Guide
I5, IE1 Intrinsically safe and FISCO model
March
European certifications
ATEX approvals
Special conditions for safe use
Quick Installation Guide
Brazilian certifications
INMETRO approvals
Special conditions for safe use
I21 Intrinsically safe
Chinese certifications
March
IB1 FISCO model
IC1 FOUNDATION fieldbus FISCO model
Japanese certifications
Quick Installation Guide
N3 Type n
March
IECEx certifications
IECEx approvals
Special conditions for safe use
Quick Installation Guide
Other certifications
Overfill protection
Suitability for intended use
Quick Installation Guide
EC Declaration of Conformity
Figure 1. EC Declaration of Conformity - page
March
Quick Installation Guide
Figure 2. EC Declaration of Conformity - page
March
Quick Installation Guide
Figure 3. EC Declaration of Conformity - page
March
00825-0100-4530,Rev EC March
Quick Installation Guide
00825-0100-4530
Emerson Process Management Rosemount Measurement
Related pages
All Install page
Installation Instructions for Miele T 1339 C
Installation for Briggs & Stratton 1687079
Installation for GE 27955
Installere mikrobølgeovnen for Samsung M1777N/XEE
Installation & Safety for Uniden XS 910
Operating and Installation Instructions Coffee System CVA for Miele CVA 2662
Installation / Initial Set-up Safety for North Star M165938N
− Installation for Miller Electric 4500 Series
When installing for Lenovo SL300
Section Driver Installation for Intel I945P
What specifications should I look for in
NuTone IMA-3303 system components
?
Top
Page
Image
Contents