Emerson 00825-0100-4530 Rev EC manual To connect the transmitter, Terminal block

Page 9
To connect the transmitter

March 2013

Quick Installation Guide

To connect the transmitter

1.Verify that the power supply is disconnected.

2.Remove the terminal block cover (see picture below).

3.Pull the cable through the cable gland/conduit. For Explosion-proof / Flameproof installations, only use cable glands or conduit entry devices certified Explosion-proof or Flameproof. Install wiring with a drip loop where the bottom of the loop must be lower than the cable/conduit entry.

4.To connect the wires, see the illustrations on the following pages.

5.Use the enclosed metal plug to seal any unused port.

6.Tighten the cable gland.

7.Mount the cover and make sure it is fully engaged to meet Explosion-proof requirements (adapters are required if M20 glands are used).

For ATEX, IECEx, NEPSI, INMETRO, and TIIS installations, lock the cover with the locking screw.

8.Connect the power supply.

NOTE:

Use PTFE tape or other sealant at the NPT threads in the Cable Entries.

Terminal block

Terminal

Block

Cover

Cable Entry, ½ in. NPT - 14 or M20x1.5 adapter

External Ground Screw

Remove the orange, protective,

 

plastic plugs, used for

 

transportation.

 

Seal any unused port with the

 

enclosed metal plug.

Terminals for signal and power supply

Cable Entry, ½ in. NPT - 14 or M20x1.5 adapter

Internal Ground Screw

Locking screw

9

Image 9
Contents Quick Installation Guide 00825-0100-4530,Rev EC MarchSuperior Performance Guided Wave Radar Level and Interface TransmitterAbout this guide Quick Installation GuideProbes with non-conductingsurfaces March ContentsStep 1: Confirm system readiness Switch HART revision modeConfirm HART revision capability Confirm correct Device DriverTank connection with flange Step 2 Mount the transmitter head/probeThreaded tank connection Tri-Clamptank connectionStep 2 continued Bracket mounting, on wallBracket mounting, on pipe Step 2 continued Remote housingGrounding Step 3 Connect the wiringTerminal block To connect the transmitterIntrinsically safe power supply Non-intrinsicallysafe power supplyHART communication Step 3 continuedQuick Installation Guide Transient protection terminal blockPower PowerQuick Installation Guide Load limitationsNon-HazardousInstallations InstallationsStep 3 continued FOUNDATION fieldbus Non-intrinsicallysafe power supplyIntrinsically safe power supply Power Consumption 0.5 W with HART address = RS-485with Modbus communicationQuick Installation Guide Step 3 continuedInstalling the Rosemount Radar Master software Step 4 Configure1Only for HART communication Run WizardFOUNDATION fieldbus parameters FOUNDATION fieldbus parameters FOUNDATION fieldbus parameters 3.Click Modbus Setup Setup - Modbus communication parametersSafety Instrumented Systems 4-20mA only InstallationConfiguration Table 3. Alarm levels and operation values Alarm and saturation levelsDamping Write protectionOperation and maintenance Site acceptanceProof test Inspection SpecificationsReferences Visual inspectionProduct certifications Safety Instrumented Systems SISEU conformity North-AmericancertificationsQuick Installation Guide Canadian Standards Association CSA approvalsDual seal maintenance I5, IE1 Intrinsically safe and FISCO modelATEX approvals European certificationsMarch Special conditions for safe useINMETRO approvals Brazilian certificationsQuick Installation Guide Special conditions for safe useMarch Chinese certificationsI21 Intrinsically safe IB1 FISCO modelQuick Installation Guide Japanese certificationsIC1 FOUNDATION fieldbus FISCO model N3 Type nIECEx approvals IECEx certificationsMarch Special conditions for safe useOverfill protection Other certificationsQuick Installation Guide Suitability for intended useFigure 1. EC Declaration of Conformity - page EC Declaration of ConformityQuick Installation Guide MarchFigure 2. EC Declaration of Conformity - page Quick Installation GuideMarch Figure 3. EC Declaration of Conformity - page Quick Installation GuideMarch 00825-0100-4530 Quick Installation Guide00825-0100-4530,Rev EC March Emerson Process Management Rosemount Measurement