Emerson
00825-0100-4530 Rev EC
manual
About this guide, Quick Installation Guide
Specifications
Install
Alarm and saturation levels
Symbol
Connect the wiring
Maintenance
Configure
Click Modbus Setup
Limited Power Supply
Switch HART revision mode
Page 2
Page 1
Page 3
Image 2
Page 1
Page 3
Contents
Superior Performance Guided Wave Radar
00825-0100-4530,Rev EC March
Quick Installation Guide
Level and Interface Transmitter
Probes with non-conductingsurfaces
About this guide
Quick Installation Guide
Contents
March
Confirm HART revision capability
Switch HART revision mode
Step 1: Confirm system readiness
Confirm correct Device Driver
Threaded tank connection
Step 2 Mount the transmitter head/probe
Tank connection with flange
Tri-Clamptank connection
Bracket mounting, on pipe
Step 2 continued
Bracket mounting, on wall
Remote housing
Step 2 continued
Step 3 Connect the wiring
Grounding
To connect the transmitter
Terminal block
HART communication
Non-intrinsicallysafe power supply
Intrinsically safe power supply
Step 3 continued
Power
Transient protection terminal block
Quick Installation Guide
Power
Non-HazardousInstallations
Load limitations
Quick Installation Guide
Installations
Intrinsically safe power supply
Step 3 continued FOUNDATION fieldbus
Non-intrinsicallysafe power supply
Quick Installation Guide
RS-485with Modbus communication
Power Consumption 0.5 W with HART address =
Step 3 continued
Step 4 Configure
Installing the Rosemount Radar Master software
Run Wizard
1Only for HART communication
FOUNDATION fieldbus parameters
FOUNDATION fieldbus parameters
FOUNDATION fieldbus parameters
Setup - Modbus communication parameters
3.Click Modbus Setup
Configuration
Safety Instrumented Systems 4-20mA only
Installation
Damping
Alarm and saturation levels
Table 3. Alarm levels and operation values
Write protection
Proof test
Operation and maintenance
Site acceptance
References
Specifications
Inspection
Visual inspection
EU conformity
Safety Instrumented Systems SIS
Product certifications
North-Americancertifications
Dual seal maintenance
Canadian Standards Association CSA approvals
Quick Installation Guide
I5, IE1 Intrinsically safe and FISCO model
March
European certifications
ATEX approvals
Special conditions for safe use
Quick Installation Guide
Brazilian certifications
INMETRO approvals
Special conditions for safe use
I21 Intrinsically safe
Chinese certifications
March
IB1 FISCO model
IC1 FOUNDATION fieldbus FISCO model
Japanese certifications
Quick Installation Guide
N3 Type n
March
IECEx certifications
IECEx approvals
Special conditions for safe use
Quick Installation Guide
Other certifications
Overfill protection
Suitability for intended use
Quick Installation Guide
EC Declaration of Conformity
Figure 1. EC Declaration of Conformity - page
March
March
Figure 2. EC Declaration of Conformity - page
Quick Installation Guide
March
Figure 3. EC Declaration of Conformity - page
Quick Installation Guide
00825-0100-4530,Rev EC March
Quick Installation Guide
00825-0100-4530
Emerson Process Management Rosemount Measurement
Related pages
All Install page
To Verify Windows 2000/XP/2003 Installation for SIIG 04-0418A
Installation for Impulse DO3623R
13 Installing Power Supply Module for Enterasys Networks X009-U
Den installierten LNB-Typ mit »B« oder »A« wählen for Grundig 22 VLE 8120 BG
Parablade Economizer Installed in Unit for Carrier 48TJF008-012
Installing the Lithium Batteries for Sharp VL Z 1 H
Installing the Hard Drive for Dell D08S
Installation Conseils de dépannage Soutien au consommateur for GE 200D9366P019
Installing the DAG 500 blower box on the front for Miele DAG 1000
Installation and Operational Checks for Hotpoint 60cm Gas Cooker
Where to access the
Husqvarna 128LD trimmer manual
?
Top
Page
Image
Contents