CME1356R and CME1656R
After Utility Connections
1.Wash out the bin. If desired, the interior of the bin could be sanitized.
2.Locate the ice scoop (if supplied) and have it available for use when needed.
3.Switch on the electrical power. Do not start the machine for 4 hours.
4.Go thru the final check list (below).
Final Check List:
___ 1. Is the unit located indoors in a controlled environment?
___ 2. Has the correct remote condenser been
properly located and mounted?
___ 3. Has the correct electrical power (voltage and phase) been supplied to the machine?
___ 4. Have all the water supply connections been properly made with the correct size tubing?
___ 5. Have all the drain connections been properly made?
___ 6. Has the unit been leveled? Level the unit at the bin.
___ 7. Have all unpacking materials been removed?
___ 8. Is the water pressure adequate?
___ 9. Is the machine secured to the ice storage bin?
___ 10. Is the bin control system been properly installed?
___ 11. Have the drain connections been checked for leaks?
___ 12. Has the bin interior been wiped clean or sanitized?
___ 13. Have any water filter cartridges been replaced?
___ 14. Check all refrigerant lines and conduit lines, for vibration or rubbing and possible failure. Adjust as needed.
___ 15. After 4 hours of electrical power, proceed to Initial Start Up.
May 2001
Page 16