Carrier XRV, 19XR specifications Example of Holiday Period Screen

Page 45

Service Operation — An overview of the tables and screens available for the SERVICE function is shown in Fig. 18.

TO ACCESS THE SERVICE SCREENS — When the SER- VICE screens are accessed, a password must be entered.

1.From the main MENU screen, press the SERVICE softkey. The softkeys now correspond to the numerals 1, 2, 3, 4.

2.Press the four digits of the password, one at a time. An asterisk (*) appears as each digit is entered

NOTE: The initial factory-set password is 1-1-1-1. If the password is incorrect, an error message is displayed

If this occurs, return to Step 1 and try to access the SER- VICE screens again. If the password is correct, the soft- key labels change to:

NOTE: The SERVICE screen password can be changed by entering the CVC/ICVC CONFIGURATION screen under SERVICE menu. The password is located at the bottom of the menu.

The CVC/ICVC screen displays the following list of available SERVICE screens:

Alarm History

Control Test

Control Algorithm Status

Equipment Configuration

ISM (Starter) Config Data

Equipment Service

Time and Date

Attach to Network Device

Log Out of Device

CVC/ICVC Configuration

See Fig. 18 for additional screens and tables available from

the SERVICE screens listed above. Use the EXIT softkey to return to the main MENU screen.

NOTE: To prevent unauthorized persons from accessing the CVC/ICVC service screens, the CVC/ICVC automatically signs off and password-protects itself if a key has not been pressed for 15 minutes. The sequence is as follows. Fifteen minutes after the last key is pressed, the default screen dis- plays, the CVC/ICVC screen light goes out (analogous to a screen saver), and the CVC/ICVC logs out of the password- protected SERVICE menu. Other screen and menus, such as the STATUS screen can be accessed without the password by pressing the appropriate softkey.

TO LOG OUT OF NETWORK DEVICE — To access this screen and log out of a network device, from the default CVC/

ICVC screen, press the MENU and SERVICE softkeys. Enter the password and, from the SERVICE menu, highlight

LOG OUT OF NETWORK DEVICE and press the SELECT softkey. The CVC/ICVC default screen will now be displayed.

HOLIDAY SCHEDULING (Fig. 25) — The time schedules may be configured for special operation during a holiday peri- od. When modifying a time period, the “H” at the end of the days of the week field signifies that the period is applicable to a holiday. (See Fig. 19.)

The broadcast function must be activated for the holidays configured on the HOLIDEF screen to work properly. Access the BRODEF screen from the EQUIPMENT CONFIGURA- TION table and select ENABLE to activate function. Note that when the chiller is connected to a CCN Network, only one chiller or CCN device can be configured as the broadcast de- vice. The controller that is configured as the broadcaster is the device responsible for transmitting holiday, time, and daylight- savings dates throughout the network.

To access the BRODEF screen, see the SERVICE menu structure, Fig. 18.

To view or change the holiday periods for up to 18 different holidays, perform the following operation:

1.At the Menu screen, press SERVICE to access the Ser- vice menu.

2.If not logged on, follow the instructions for Attach to Net- work Device or To Log Out. Once logged on, press

NEXT until Equipment Configuration is highlighted.

3.Once Equipment Configuration is highlighted, press SELECT to access.

4.Press NEXT until HOLIDAYS is highlighted. This is the Holiday Definition table.

5.Press SELECT to enter the Data Table Select screen. This screen lists 18 holiday tables.

6. Press NEXT to highlight the holiday table that is to be viewed or changed. Each table is one holiday period, starting on a specific date, and lasting up to 99 days.

7.Press SELECT to access the holiday table. The Config- uration Select table now shows the holiday start month and day, and how many days the holiday period will last.

8.Press NEXT or PREVIOUS to highlight the month, day, or duration.

9.Press SELECT to modify the month, day, or duration.

10.Press INCREASE or DECREASE to change the selected value.

11.Press ENTER to save the changes.

12.Press EXIT to return to the previous menu.

Fig. 25 — Example of Holiday Period Screen

45

Image 45
Contents Safety Considerations Start-Up, Operation, and Maintenance InstructionsContents Contents Abbreviations and Explanations Introduction19XR Identification Chiller FamiliarizationTypical 19XR Components Motor and Lubricating OIL Cooling Cycle Refrigeration CycleLubrication Cycle VFD Cooling CycleUnit-Mounted Solid-State Starter Optional Starting EquipmentUnit-Mounted Wye-Delta Starter Optional ControlsDefinitions Variable Frequency Drive VFD 19XR Controls and Sensor Locations PIC II Component Panel Location Major PIC II Components Panel LocationsControl Panel CVC/ICVC Operation and Menus Fig Example of Status Screen 19XR Chiller Display Menu Structure CVC/ICVC 19XR Service Menu Structure Time and Date Example of Time Schedule Operation Screen Example of Set Point Screen CVC/ICVC Display Data Example 1 Chiller Display Default ScreenDescription Status Units Point Example 2 Maintstat Display ScreenExample 3 Startup Display Screen Startup Description Status Units PointExample 5 Heatex Display Screen Example 4 Compress Display ScreenExample 7 Ismstat Display Screen Example 6 Power Display ScreenExample 8 CVC/ICVCPSWD Display Screen Menu Setpoint Select Description Status Units Point DefaultCVC Icvc Description Status Units Point Example 9 Setpoint Display ScreenExample 11 Override Display Screen Control Algorithm Status Override Description Units PointExample 12 Llmaint Display Screen Example 13 Ismhist Display Screen Example 14 Wsmdefme Display ScreenControl Algorithm Status Wsmdefme Description Units Point Ismconf Description Status Units Point Default ISM Starter Config DataExample 15 Netopt Display Screen Example 16 Ismconf Display ScreenExample 18 SETUP1 Display Screen Spare ALERT/ALARM EnableExample 17 Options Display Screen Example 19 SETUP2 Display Screen Example 20 Leadlag Display ScreenLAG=2, STANDBY=3 Reset Type Description Status Units Point DefaultExample 21 Rampdem Display Screen Example 22 Tempctl Display ScreenSurge Prevention Mode occurs when Active Delta T Normal Control mode occurs when Active Delta TMode IGV VFD PIC II System FunctionsPage Protective Safety Limits and Control Settings Page Capacity Overrides Evaporator Freeze Protection Icvc only a Page Head Pressure Reference Output Surge Protection Fixed Speed ChillerPage Page Point Example of Attach to Network Device Screen Example of Holiday Period Screen START-UP/SHUTDOWN Default CVC/ICVC screen, press the MenuRecycle Sequence Fig Local Start-Up Local start-up or a manual start-up isEntering Condenser Water temperature plus 3 F -1.6C Before Initial START-UP Job Data RequiredEquipment Required 19XR Leak Test Procedures Page Page HFC-134a Pressure Temperature F HFC-134a Pressure Temperature CTemperature Pressure Perform dehydration as follows Inspect WiringCheck Starter Manufacturer Cable noWhite G Software Configuration Parameter Benshaw RediStart Micro Menu Items Verify VFD Configuration and Change Parameters if Necessary VFD Title Setting Parameter Description SettingDescription Settings Press Menu Press Status Press Compress Press Select Press Status Press Compress Press SelectLoad Surge Prevention Occurs TOO Soon Occurs TOO Late Estimated Minimum Load ConditionsCCM Temperature Thermistors Charge Refrigerant into Chiller Control Test Menu FunctionsTests to be Devices Tested Performed Refrigerant HFC-134a Charge Initial START-UPDry Run to Test Start-Up Sequence Check Motor RotationCheck Oil Pressure and Compressor Stop Operator Duties Operating InstructionsTo Start the Chiller To Stop the ChillerOperating the Optional Pumpout Unit Pumpout and Refrigerant Transfer ProceduresTime Date Cooler Condenser CompressorBearing FLAValve Condition Turn off pumpout condenser waterChillers with Isolation Valves Test After Service, Repair, or Major Leak If General MaintenanceGuide Vane Actuator Linkage Weekly MaintenanceCheck Safety and Operating Controls Monthly Scheduled MaintenanceInspect the Heat Exchanger Tubes and Flow Devices Compressor Bearing and Gear MaintenanceOptional Pumpout System Controls Ordering Replacement Chiller Parts WhenChecking Pressure Transducers Troubleshooting GuideHeatex LlmaintOccdefcm Shutdown in Progress Terminate Pumpdown ModeICE Build Ready to StartAlert PrestartAutorestart in Progress Running Temp ControlRUN Capacity FaultLimited SensorFailure to ProtectiveStart StopCommunication LossPotential FREEZE-UPLOW OIL Pressure Sensor AlertAutorestart PendingRecycle Pressure AlertOption Sensor DiffuserDrop Thermistor Temperature F vs. Resistance/Voltage DropTemperature PIC Resistance Thermistor Temperature C vs. Resistance/Voltage DropControl Modules Power is connected to Plug J1 on each moduleChiller Control Module CCM Fig Integrated Starter Module FigReplacing Defective Processor Modules Integratedstartermodule Checked Measure SCR Pairs Recorded Being BetweenNumber of Tubes English Code Heat Exchanger Data EnglishNumber of Tubes Code Heat Exchanger Data SI19XR Additional Data for Marine Waterboxes Compressor WeightsEnglish Motor 19XR Motor Weights Standard and High Efficiency Motors19XR Waterbox Cover Weights English lb 19XR Waterbox Cover Weights SI kg Additional Miscellaneous Weights Optional Pumpout System Electrical DataMotor Voltage Code Description Torque Compressor Assembly TorquesCompressor Code View B High Speed Shaft 19XR Compressor ClearancesAllen-Bradley Wye-Delta Unit-Mounted Starter 100101 ISM 102Temp 103104 105 106 107 Power Panel Wiring Schematic108 Cutler-Hammer Wye Delta Unit Mounted Starter Sizes 3-5DP109 Cutler-Hammer Wye Delta Unit Mounted Starter Size 6DPSeparate Metering Option Ground Fault Phase Current Option111 AUX 112FU Fuse 113114 VFD 115116 Typical Variable Frequency Drive VFD Wiring Schematic117 118 119 120 121 122 Index Index JOB Data Required Remove and use for job fileCL-2 Inspect Wiring and Record Electrical Data Ratings10 to 40 to 10060.0 15 toCL-4 460 200 to105 to 115 85 to50 to 30 to20 to Psi CL-690 to 150 to125 125 to65 to 90 to 100Amp 250 CL-8 CL-9 25 toCL-10 50 to 1450200 0000 to0000 to 0200 CL-11004 To H.022 Job Sheet 60 for 60 Hz and 50 for 50 Hz 002 Power Module Dependent Selected motor 100% amps028 10 to Job Sheet 60 for 60 Hz and 50 for 50 Hz 000 100 to Selected line voltageCL-13 CL-14 CCN Local ResetPage Incurring obligations
Related manuals
Manual 40 pages 46.08 Kb

19XR, XRV specifications

The Carrier 19XR and 19XRV chillers are sophisticated cooling solutions that represent the forefront of HVAC technology. Designed for large commercial and industrial applications, these chillers provide exceptional performance, energy efficiency, and reliability, making them ideal for a variety of environments ranging from hospitals to manufacturing facilities.

One of the most significant features of the Carrier 19XR and 19XRV chillers is their advanced scroll compressor technology. These units employ a tandem scroll design that enhances efficiency while minimizing operational noise. This makes them ideal for urban environments where noise restrictions may be in place. Moreover, the compressors are equipped with variable speed drive options in the 19XRV model, which allows for greater energy savings by adjusting cooling output based on real-time demand.

In addition to their advanced compressors, the 19XR and 19XRV units incorporate the Carrier GreenChoice refrigerant, which has a lower global warming potential compared to traditional refrigerants. This innovative choice not only meets regulatory requirements but also contributes to sustainability goals, making these chillers a responsible choice for environmentally conscious organizations.

The units are engineered with a robust heat exchanger design, which enhances heat transfer efficiency and overall system performance. This ensures optimal operation even in extreme conditions. They feature a microprocessor-based control system that allows for precise monitoring and control of the chiller’s performance, enabling operators to make real-time adjustments to maximize energy efficiency.

The Carrier 19XR and 19XRV chillers also prioritize serviceability. The design incorporates easy access to key components, simplifying maintenance procedures and reducing downtime. This focus on maintainability extends the lifespan of the equipment, leading to lower lifecycle costs.

In terms of connectivity, these chillers are equipped with advanced Building Management System (BMS) integration capabilities. This allows for seamless monitoring and control of the chillers using a centralized platform, facilitating energy management and operational optimization.

Overall, the Carrier 19XR and 19XRV chillers stand out in the market for their blend of cutting-edge technology, energy efficiency, and user-friendly features. They are engineered to meet the demanding needs of modern commercial and industrial applications, making them a preferred choice for facility managers seeking reliable cooling solutions.