Fan Operation Verification

To verify that the fan unit and the power supply fan are functioning correctly you need to visually inspect the fan unit(s) on the rear of the concentrator to make sure they are turning and that nothing is blocking their path.

Power Supply Operation Verification

Verify that the LEDs on the Controller Module appear as defined in Table 2-3 to check the operation of the power supply.

Table 2-3. Controller Module LEDs After Proper Power-Up

LED

Proper State

 

 

 

Primary Power

On.

 

 

 

Backup Power

On. A backup power supply is installed.

 

 

 

 

 

Off. No backup power supply is installed.

 

 

Temperature (TEMP)

Off.

 

 

 

Installation and Troubleshooting 2 - 21

Page 51
Image 51
3Com 5017C-LS, 5017C with load sharing Fan Operation Verification, Power Supply Operation Verification