Installing the ONline System Concentrator

The ONline System Concentrator can be placed on top of a table or a shelf, or mounted in a rack. Make sure the cable tray has been installed first on the table or in the rack (or that 1 3/4" (4.5 cm) of vertical space has been provided below the unit for air flow) and that the location meets all the environmental considerations specified earlier in this chapter.

Caution: 3Com recommends that two people install the unit since it weighs 38 lbs (17 kg) with one power supply and 46 lbs (24 kg) with the backup power supply installed.

3Com also recommends installing the backup power supply prior to rack mounting the unit (see the section titled Installing the Backup Power Supply later in this chapter). In some rack cabinets, the rear of the cabinet may interfere with installation or removal of the power supply and fan.

Rack Mounting the ONline System Concentrator

The ONline System Concentrator can be mounted in four different configurations in the rack. Use the same rack settings for both the cable tray and the concentrator. If you are not installing the cable tray in the rack, you should select the concentrator mount setting at this time. Refer to Table 2-2 and Figure 2-2 in the “Cable Tray Rack Mounting” section for specifics about the four mounting settings.

Follow the steps below to mount the concentrator in your rack:

1.Attach the two rack mount flanges to the ONline concentrator unit in the position you want as shown in Figure 2-4 using the eight (8) provided 8-32 x 1/4" flathead screws - four per side.

Installation and Troubleshooting 2 - 11

Page 41
Image 41
3Com 5017C with load sharing Installing the ONline System Concentrator, Rack Mounting the ONline System Concentrator