Figure 2-12. Network Cable Connections

Power Up and Verification

This section tells how to power up the concentrator and verify that it is working correctly.

Switch the power supply On/Off switch to the On () position.

The Power Supply LED(s) on the ONline Controller Module light when the unit is powered up correctly. The verification procedure is split into the following areas:

fan operation

power supply operation

network operation

2 - 20 ONline 17-Slot System Concentrator Installation and Operation Guide

Page 50
Image 50
3Com 5017C with load sharing, 5017C-LS installation and operation guide Power Up and Verification, Network Cable Connections