Power Board Installation

1.Place the power board onto the lower case and press down to secure it. Refer to Figure 3-36.

2.Install and secure two (2) screws to the power board. Refer to Figure 3-35

3.Install the mainboard.

ID

Size

Quantity

Screw Type

 

 

 

 

 

 

Red

M2.5*3.5

2

 

 

 

 

 

 

Call

 

 

 

 

 

out

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3-38

Machine Maintenance Procedures

Page 122
Image 122
Acer 5349 manual Power Board Installation