Getting Started

Flowchart Figure 3-1identifies sections for the removal and install sequence. Follow the order of the sequence to avoid damage to any of the hardware components.

Do the following prior to starting any maintenance procedures:

1.Remove power (A) from the system and peripherals.

2.Remove all cables from system.

A

Figure 3-2. AC Adapter Outlet

3.Put system on a stable work surface.

Machine Maintenance Procedures

3-7

Page 91
Image 91
Acer 5349 manual Getting Started, AC Adapter Outlet