Installation and Set-up
5 Place the unit in the equipment rack.
▲Important! When fully loaded, the IntraChassis 9000 can weigh over 100 lbs. Use proper lifting equipment and techniques, as described in “Lifting the Chassis Safely” earlier in this chapter, to prevent back and other injuries.
6 Secure the unit by screwing its mounting brackets to the equipment rack. Use a minimum of six {right?} screws for this purpose.
▲Important! Make sure the unit is supported until all the mounting screws for each bracket are secured to the equipment rack. Failure to do so could cause the unit to fall, resulting in personal injury or damage to the unit, or both.
7 Proceed to the “Cable Guide Installation” section.
Free-Standing/Desktop Installation of the Chassis
The IntraChassis 9000 chassis has four rubber feet on the bottom of the chassis that allow for
For
1
2 Place the unit on a flat surface with a minimum area of 17.1” x 13.5” (434.3 mm x 342.9 mm) and support capac- ity of 150 lbs (68.2 kg).
3
4
Make sure there is enough ventilation space between the IntraChassis 9000 and surrounding objects.
Proceed to “Cable Guide Installation” below.
Cable Guide Installation
Before installing any of the modules in your IntraChassis 9000, place the cable guide hook units on each side of the front panel and attach them with the screws provided. Make sure you install the guides in such a way that the hooks open upward.
Page