Chapter 1: Introduction
Ensuring that the preinstallation tasks are complete
The preinstallation team completes the following tasks. If these tasks are not complete, do not continue with the installation.
●Verify that the required number of open,
●Verify that the rail kit to support the server is available to install.
●Verify that the rail kit that is required to support the UPS is installed on the rack or available to install. For how to install the rails, see the documentation that comes with the rail kit.
●Verify that the equipment racks are grounded per local code. See Job Aid: Approved Grounds
●Verify that the
●Verify that cables for theTN2312BP (IPSI) circuit packs are labeled and run from the control hardware rack to the port networks or that appropriate connectivity is provided.
Equipment specifications
The components of the
Table 1: Control network components specifications
| Dimensions | Dimensions | Height | Weight |
Component | English | Metric | (u) | (lb/kg) |
(height x width x depth | (height x width x depth |
|
| |
|
|
| ||
| in inches) | in centimeters) |
|
|
|
|
|
|
|
Server | 3.4 x 17.5 x 26 | 8.6 x 45 x 66 | 2 | 60/27 |
S8710, S8720, or | ||||
S8730 |
|
|
| (loaded) |
|
|
|
|
|
Ethernet switch: | 1.75 x 17 x 14.4 | 4 x 43 x 37 | 1 | 11/5 |
C363T | ||||
C364T | 1.75 x 17 x 14.4 | 4 x 43 x 37 | 1 | 11/5 |
UPS: | 3.5 x 17 x 19 | 9 x 43 x 48 | 2 | 34/15 |
700 VA | ||||
1500 VA | 3.5 x 17 x 24 | 9 x 43 x 61 | 2 | 50/23 |
|
|
|
|
|
10 Installing and Configuring the Avaya | January 2008 |