Pre-installation requirements

-Postinstallation administration on page 67

-Installation verification on page 75

-Server access on page 87

-Installation troubleshooting on page 97 if problems occur during the installation.

Pre-installation requirements

This section describes the tasks that you must complete before you start the installation. You complete certain tasks before you go on site and other tasks at the site.

PNC license settings for S8700-series Servers

For Communication Manager Release 4.0 and later releases, the two major types of port network connectivity, IP-PNC and fiber-PNC (also called multiconnect), are both automatically enabled in all licenses for S8700-series Server. As a result, unlike the license settings in previous releases, platform 8 for IP-PNC and the Internet Protocol (IP) PNC feature attribute are no longer needed and are not available as license options. For Release 4.0 and later releases, you always select platform 6, multiconnect, in a license for an S8700-series Server.

Preinstallation tasks to complete at the customer site

Before you start the installation, you must:

Verify that all the required equipment is on site

Ensure that the preinstallation team completed the preinstallation tasks

Install the DAL2 card, if used

Verifying that all the required equipment is on site

Compare the list of items that were ordered to the contents of the boxes to verify that you have all the equipment. Your project manager can give you an inventory list. Do not rely on the packing slips inside the boxes for the correct information.