Synergy 700 user guide ~ 7th Edition ~ 13th May ’02 ~ 4411
Setting up
Follow these steps to set up your Synergy 700 ready for use
SETTING UP
Plan the location
Position your Synergy 700 within 2 metres of a power socket and phone socket otherwise extension cables will be required.
Make sure it is at least 1 metre away from other electrical products to avoid interference.
Do not place your Synergy 700 product in the bathroom or other humid areas.
1Connect the power supply to the base
Plug the power adaptor into the mains power socket and switch on. The green Power/In Use light comes on.
Your Synergy 700 will announce the default settings of the answering machine. See page 14.
Note
The base station must be plugged into the mains power socket at all times.
Do not connect the telephone line cord to the phone socket until your handset is fully charged. This will prevent the risk of the phone being answered before the battery pack is charged. Answering the phone before the battery pack is fully charged may prevent it from reaching its optimum capacity.
Warning
Under no circumstances should a
11