Cisco Systems 2600 Inspecting the Router, Tools and Equipment for Installation and Maintenance

Models: 2600

1 104
Download 104 pages 30.17 Kb
Page 38
Image 38

Chapter 2 Preparing to Install the Router

Inspecting the Router

Maintenance schedules and requirements

Maintenance procedures performed

Intermittent problems

Comments and notes

Inspecting the Router

Do not unpack the router until you are ready to install it. If the final installation site will not be ready for some time, keep the chassis in its shipping container to prevent accidental damage. When you are ready to install the router, proceed with unpacking it.

The router, cables, publications, and any optional equipment you ordered may be shipped in more than one container. When you unpack the containers, check the packing list to ensure that you received all the following items:

Router

6-foot (1.8-meter) power cord

Rubber feet for desktop mounting (with routers of 1 rack-unit height only)

Rack-mount brackets with screws for 19-inch rack (with all Cisco 2600 series routers)

Rack-mount brackets with screws for 23-inch rack (with Cisco 2691 routers only)

Grounding lug and bracket

RJ-45-to-DB-9 adapter cable for console connection

RJ-45-to-DB-25 adapter cable for modem connection

Ethernet cable

Optional equipment (such as network connection cables or additional rack-mount brackets)

Cisco 2600 Series Modular Routers Quick Start Guide

Cisco 2600 Series, Cisco 3600 Series, and Cisco 3700 Series Regulatory Compliance and Safety Information document

Inspect all items for shipping damage. If anything appears to be damaged, or if you encounter problems installing or configuring your router, contact customer service. Warranty, service, and support information is in the quick start guide that shipped with your router.

Tools and Equipment for Installation and Maintenance

You need the following tools and equipment to install and upgrade the router and its components:

ESD-preventive cord and wrist strap

Number 2 Phillips screwdriver

Flat-blade screwdrivers: small, 3/16-inch (4-5 mm) and medium, 1/4-inch (5-6 mm)

To install or remove modules

To remove the cover or mainboard tray, if you are upgrading memory or other components

Rack-mount screws

ROM 32-pin PLCC extractor tool

Cisco 2600 Series Routers Hardware Installation Guide

2-6

OL-2171-06

 

 

Page 38
Image 38
Cisco Systems 2600 manual Inspecting the Router, Tools and Equipment for Installation and Maintenance