Cisco Systems 3560-C 2-26, 24 Sliding the Retainer Through the Latch, 25 Locking the Retainer

Models: 3560-C

1 92
Download 92 pages 61.68 Kb
Page 52
Image 52
Figure 2-24 Sliding the Retainer Through the Latch

Chapter 2 Switch Installation

Installing the Power Cord Retainer (Optional)

Step 3 Slide the retainer through the first latch. See Figure 2-24.

Figure 2-24 Sliding the Retainer Through the Latch

1

RESET

 

3

2

1 AC power cord

3 Latch

2Smaller sleeve for thin power cords

Step 4 Slide the retainer through the other latches to lock it. See Figure 2-25.

Figure 2-25 Locking the Retainer

208985

1

RESET

 

2 3

(

1 AC power cord

3 Latches

2Sleeve for thin power cords

208986

Step 5 (Optional) Use the small sleeve for thin power cords. Use the small sleeve to provide greater stability for thin cords. Detach the sleeve, and slide it over the power cord. See Figure 2-26.

 

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

2-26

OL-23803-02

Page 52
Image 52
Cisco Systems 3560-C manual 2-26, 24 Sliding the Retainer Through the Latch, 25 Locking the Retainer