Chapter 2 Preparing for Installation

Site-Planning Checklist

Table 2-2

 

Site-Planning Checklist (continued)

 

 

 

 

 

 

 

 

Task No.

Planning Activity

Verified by

Time

Date

 

 

 

 

 

3

Power evaluation:

 

 

 

 

•

Input power type

 

 

 

 

• Receptacle proximity to the equipment

 

 

 

 

• Dedicated (separate) circuits for redundant

 

 

 

 

 

power supplies

 

 

 

 

• UPS for power failures

 

 

 

 

 

 

 

 

4

Grounding evaluation:

 

 

 

 

•

Circuit breaker size

 

 

 

 

 

 

 

 

5

Cable and interface equipment evaluation:

 

 

 

 

•

Cable type

 

 

 

 

•

Connector type

 

 

 

 

•

Cable distance limitations

 

 

 

 

•

Interface equipment (transceivers)

 

 

 

 

 

 

 

 

6

EMI evaluation:

 

 

 

 

• Distance limitations for signaling

 

 

 

 

•

Site wiring

 

 

 

 

•

RFI levels

 

 

 

 

 

 

 

 

 

 

Catalyst 4500 Series Switches Installation Guide

2-18

78-14409-08

Page 88
Image 88
Cisco Systems 4500 manual Task No Planning Activity Verified by Time Date