Chapter 3 Installing the Switch

Rack-Mounting the Switch

To check the contents of the shipping container follow these steps:

Step 1 Check the contents of the accessories kit against the packing slip. Verify that you received all listed equipment, which should include the following:

Switch hardware and software documentation, if ordered

Optional equipment that you ordered, such as network interface cables, transceivers, or special connectors

Step 2 To begin installation, proceed to the “Rack-Mounting the Switch” section on page 3-2.

Rack-Mounting the Switch

A standard rack-mount kit is included for mounting the switch in a standard

19-inch (48.3 cm) four-post equipment rack. A standard equipment rack has two unobstructed front posts, a minimum depth between the front and rear mounting posts of 19.25 inches (48.9 cm), and a maximum depth of 32 inches (81.3 cm).

This kit is not suitable for racks with obstructions (such as a power strip) that could impair access to the switch.

A separate mounting kit for a two-post telco rack is available, and differs mainly in the dimensions and in the absence of the rear mounts.

Caution Before installing the chassis in a rack, read the “Site Environmental Requirements” section on page 2-1to become familiar with the proper site and environmental conditions. Failure to read and follow these guidelines could lead to an unsuccessful installation and possible damage to the system and components.

Caution This unit is meant to be rack-mounted, and is not intended to bear more than its own weight. Do not stack more than two on a table top, the added weight may damage the bottom chassis.

 

Cisco Catalyst 4900M Switch Installation Guide

3-2

78-18350-01

Page 46
Image 46
Cisco Systems 4900M manual Rack-Mounting the Switch