![](/images/new-backgrounds/1190649/190649127x1.webp)
Chapter 3 Installing the Switch
Configurable Modules
To install a switching module in a Catalyst 4900M series switch, follow this procedure:
Step 1 Take the necessary precautions to prevent ESD damage as described in Appendix B and in Chapter 2.
Step 2 Choose a slot for the new switching module. Ensure that you have enough clearance to accommodate any interface equipment that you will connect directly to the switching module ports.
Step 3 Loosen the captive installation screws that secure the
Step 4 Remove the
Step 5 To install the new switching module, grasp the
Step 6 Align the edges of the circuit board with the slot guides on the sides of the switch chassis, as shown in Figure
| Cisco Catalyst 4900M Switch Installation Guide |