Chapter 2 Site Planning
Site Power Requirements
The switch operates as a standalone system mounted in a rack in a secure wiring closet. It requires a dry, clean,
To ensure normal operation and avoid unnecessary maintenance, plan your site configuration and prepare your site before installation. After installation, make sure that the site maintains an ambient temperature of 0 to 40° C (32 to 104° F). It is essential to keep the area around the chassis as free from dust and foreign conductive material (such as metal flakes from nearby construction activity) as is possible.
Multiple switches can be
Cooling air is drawn in through the right side and exhausted through the left side of the chassis. Keep the sides and rear clear of obstructions, including dust and foreign conductive material, and away from the exhaust ports of other equipment.
Appendix A, “Specifications,” lists the operating and nonoperating environmental site requirements for the switches. To maintain normal operation and ensure high system availability, maintain an ambient temperature and
Site Power Requirements
This section describes the installation site power requirements for the
Catalyst 4900M switch. Verify your site power before you install the switch.
This section consists of the following sections:
•Preinstallation Requirements, page 2-3
•Warnings and Cautions, page