3-16
3-19

Contents

C H A P T E R 2

Site Planning 2-1

 

 

 

 

 

 

Site Environmental Requirements

2-1

 

 

Site Power Requirements

2-2

 

 

 

Preinstallation Requirements

2-3

 

 

Warnings and Cautions

2-3

 

 

 

EMI Recommendations

2-4

 

 

 

Power Requirements and Heat Dissipation

2-4

 

Grounding Requirements

2-4

 

 

 

 

Safety Overview 2-5

 

 

 

 

 

Ensuring Safety

2-5

 

 

 

 

 

Working Safely with Electricity 2-6

 

 

Preventing Electrostatic Discharge Damage

2-7

 

Site Planning Checklist 2-7

 

 

 

 

Installing the Switch

 

 

 

 

 

C H A P T E R 3

3-1

 

 

 

 

Checking the Contents 3-1

Rack-Mounting the Switch 3-2

Rack-Mounting Guidelines 3-3

Lifting the Chassis Safely 3-4

Required Installation Tools 3-5

Rack-Mounting the Catalyst 4900M Switch 3-6

Connecting Power to the Catalyst 4900M Switch 3-11

Connecting DC Power to the Catalyst 4900M Switch 3-13

Optical Connections 3-15

Configurable Modules 3-15

Required Tools 3-16

Removing Switching Modules

Installing Switching Modules

Cisco Catalyst 4900M Switch Installation Guide

vi

78-18350-01

 

 

Page 6
Image 6
Cisco Systems 4900M manual Site Planning