Contents
C H A P T E R 2 | Site Planning |
|
|
|
|
|
| Site Environmental Requirements |
| ||||
| Site Power Requirements |
|
| |||
| Preinstallation Requirements |
| ||||
| Warnings and Cautions |
|
| |||
| EMI Recommendations |
|
| |||
| Power Requirements and Heat Dissipation | |||||
| Grounding Requirements |
|
|
| ||
| Safety Overview |
|
|
|
| |
| Ensuring Safety |
|
|
|
| |
| Working Safely with Electricity |
| ||||
| Preventing Electrostatic Discharge Damage | |||||
| Site Planning Checklist |
|
|
| ||
| Installing the Switch |
|
|
|
|
|
C H A P T E R 3 |
|
|
|
|
Checking the Contents
Lifting the Chassis Safely
Required Installation Tools
Connecting Power to the Catalyst 4900M Switch
Connecting DC Power to the Catalyst 4900M Switch
Optical Connections
Configurable Modules
Required Tools
Removing Switching Modules
Installing Switching Modules
Cisco Catalyst 4900M Switch Installation Guide
vi |
| |
|