Chapter 3 Installing the Switch

Connecting Power to the Catalyst 4900M Switch

Connecting Power to the Catalyst 4900M Switch

Follow these steps and warnings when connecting power to the Catalyst 4900M switch:

Step 1 Prior to connecting the power supply to a power source, ensure that all of the site power and grounding requirements described in Chapter 2, “Site Planning,” have been met and the chassis is properly grounded as described in the “Grounding Requirements” section on page 2-4. The grounding pad for the switch is shown in Figure 3-5.

Figure 3-5 Grounding Pad Location

232131

1

1

Grounding pad

Warning The plug-socket combination must be accessible at all times because it serves as the main disconnecting device. Statement 1019

Step 2 Plug the power cords into the power supplies. Refer to Figure 3-6for the plug location.

 

 